Permit: TC-MDP-1023-01704
Permit Details
Apply Date:
10/24/2023
Applicant:
Joshua Swinney
Description:
Great Sand Dunes SFR Model Escalara
Permit Reviews
Permit Number - TC-MDP-1023-01704
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
11/15/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/21/2023 | APPROVED |
08/22/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/23/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1023-01704
Permit Status: Complete
Permit Description: Great Sand Dunes SFR Model Escalara
Date | Description | Comments |
---|---|---|
11/15/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
11/28/2023 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as a contact. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
04/04/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
01/20/2023 | Post-Tension Inspection Report is required. | |
04/04/2024 | Post-Tension Inspection Report is required. | |
03/21/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
11/28/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/04/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
01/20/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
04/04/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01704
Permite Description: Great Sand Dunes SFR Model Escalara
Total Outstanding Inspections - 3
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/14/2024 | COT - RSBU - Excavation/Rebar/Zoning | N/A | Partial Pass | Setbacks |
06/03/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
06/03/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01704
Permit Description: Great Sand Dunes SFR Model Escalara
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/14/2024 | COT - RSPL - Rough Soil | Passed | ||
03/28/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete. | |
04/04/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete. | |
04/04/2024 | COT - RSEL - Grounding/Bonding | Passed | Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete. | |
04/19/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | All exterior walls are properly secured to concrete floor with bolts or by hilti nail gun. All shear wall have the proper Hilti brackets in place and are properly secured to the floor with bolts. All exterior shear walls are properly covered with plywood and nailed off per plans. Okay to proceed with window and door installation. | |
04/19/2024 | COT - RSBU - Roof Nailing | Passed | H2.5 clips are properly attached to each truss and floor joists. Plywood sheathing is properly nailed off on roof and porches. Okay to proceed with roof dry-in. | |
06/03/2024 | COT - RSPL - Yard Water Line | Passed | ||
06/05/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 6/4/24: Exhaust fan in bathroom is properly wired, shower pan upstairs is under water test, blocking has been added between floors for upstairs girder beam. Okay to proceed with drywall and insulation installation. | |
06/17/2024 | COT - RSBU - Interior Shear Bracing | Passed | Interior shear walls are properly drywalled with the correct screw pattern per plan. Okay to proceed with tape, texture, and paint of walls and ceiling. | |
07/22/2024 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. 7/22/2024 | |
08/06/2024 | COT - RSPL - Sewer | Passed | ||
08/27/2024 | ENGR Engineering Final | Passed | ||
08/30/2024 | COT - RSEL - Electrical Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project. | |
08/30/2024 | COT - RSEL - Outdoor Lighting | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project. | |
08/30/2024 | COT - RSME - Mechanical Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project. | |
08/30/2024 | COT - RSPL - Plumbing Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project. | |
08/30/2024 | RSBU - Building Final | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project. | |
08/30/2024 | RSBU - Building Progress | Passed | Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project. |