Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
7457 S KELLER LN
Apply Date:
11/14/2023
Applicant:
Joshua Swinney
Description:
Eisenhower Model Plan La Escalera

Permit Reviews

Permit Number - TC-MDP-1023-01701
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera
Start Date Submittal Complete Date Status  
08/22/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/23/2024 APPROVED Review Details
10/27/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/20/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1023-01701
Permit Status: Complete
Permit Description: Eisenhower Model Plan La Escalera
Date Description Comments
11/15/2023 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
11/20/2023 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
11/15/2023 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/20/2023 Post-Tension Inspection Report is required.
10/25/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/12/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
12/12/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
08/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
01/20/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-1023-01701
Permite Description: Eisenhower Model Plan La Escalera
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
03/28/2024 COT - RSPL - Gas Pressure Test N/A Not Applicable
03/14/2024 COT - RSBU - Excavation/Rebar/Zoning N/A Partial Pass Setbacks
06/03/2024 COT - BULD - SWG Clearance N/A Not Applicable

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1023-01701
Permit Description: Eisenhower Model Plan La Escalera
Total Completed Inspections - 19
Date Description Inspector Results Comments
03/14/2024 COT - RSPL - Rough Soil Passed
03/28/2024 COT - RSEL - Electrical Underground Passed
04/03/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete.
04/03/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete.
04/03/2024 COT - RSEL - Grounding/Bonding Passed Concrete forms are set, post tension cabling is properly installed per plans, Simpson clips are properly installed and secured to form work per plans, all plumbing pipes are properly wrapped with foam padding, and 20' rebar is placed in footing for Ufer ground. Okay to pour concrete.
04/17/2024 COT - RSBU - Exterior Clips/Sheathing Passed H2.5 clips are nailed to every rafter and trusses. Exterior sheathing is properly nailed off per plans. Anchor bolts are installed were required for interior shear walls and were masa clips are only catching 1 ear. Okay to proceed with dry-in of roof and window installation.
04/17/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly nailed down and have H2.5 clips nailed properly. Roof sheathing is properly secured to the trusses. 2nd floor sheathing is properly nailed and screwed to floor joists. Okay to proceed with dry-in of roof.
06/03/2024 COT - RSPL - Yard Water Line Passed
06/05/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 6/4/24: Exhaust fan in bathroom is properly wired, shower pan upstairs is under water test, registers have been moved closer to floor joists to allow for 3 point connection of air registers. Okay to proceed with drywall and insulation installation.
06/14/2024 COT - RSBU - Interior Shear Bracing Passed
07/25/2024 BULD - Electrical Clearance Passed TEP ECO
08/06/2024 COT - RSPL - Sewer Passed
08/27/2024 ENGR Engineering Final Passed
08/30/2024 COT - RSEL - Electrical Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.
08/30/2024 COT - RSEL - Outdoor Lighting Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.
08/30/2024 COT - RSME - Mechanical Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.
08/30/2024 COT - RSPL - Plumbing Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.
08/30/2024 RSBU - Building Final Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.
08/30/2024 RSBU - Building Progress Passed Construction is completed. Mechanical, electrical, and plumbing fixtures are installed and operational. Electrical panel is properly labeled with AFCI/GFCI breakers installed as required. Outdoor lighting is installed per plans and city regulations. Okay to issue Certificate of Occupancy for this project.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
LOT 217 SIC-2024-08-16_V1.PDF DOCUMENTS VIEW
Z510 EISENHOWER - TRUSS REVIEW LETTER - LAYOUT_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
FINAL PLAT RECORDATION (5 MODEL PERMITS)_V1.PDF DOCUMENTS VIEW
PHASE 1 LOT 217_V1.PDF DOCUMENTS VIEW