Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-1023-01699
Permit Details
Apply Date:
10/24/2023
Applicant:
Joshua Swinney
Description:
SFR 500 Coolidge Model Plan La Escalera
Permit Reviews
Permit Number - TC-MDP-1023-01699
Permit Status: Complete
Permit Description: SFR 500 Coolidge Model Plan La Escalera
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/10/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 09/11/2024 | REQUIRES RESUBMIT |
11/15/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 11/21/2023 | APPROVED |
09/18/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 09/19/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-1023-01699
Permit Status: Complete
Permit Description: SFR 500 Coolidge Model Plan La Escalera
Date | Description | Comments |
---|---|---|
11/15/2023 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
09/11/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
01/19/2023 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
04/03/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
11/15/2023 | Post-Tension Inspection Report is required. | |
10/25/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
12/12/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
04/03/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
12/12/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
09/11/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
01/19/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
04/03/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01699
Permite Description: SFR 500 Coolidge Model Plan La Escalera
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
06/17/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | Not required. No gas to any house in this subdivision. |
06/17/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | Not required. No gas to any house in this subdivision. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-1023-01699
Permit Description: SFR 500 Coolidge Model Plan La Escalera
Total Completed Inspections - 19
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
03/28/2024 | COT - RSEL - Electrical Underground | Passed | ||
04/03/2024 | COT - RSPL - Rough Soil | Passed | ||
04/11/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
04/11/2024 | COT - RSBU - Preslab | Passed | ||
04/11/2024 | COT - RSEL - Grounding/Bonding | Passed | ||
04/29/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | All masa clips are properly nailed, shear wall clips are properly nailed, plywood sheathing for interior and exterior shear walls are properly nailed, bolts or shot pins are installed in bottom plate on 1st floor and 16P nails are nailed into the bottom plate of the 2nd floor. All straps, H2.5 clips, and stud plates are properly secured. Okay to proceed. | |
04/29/2024 | COT - RSBU - Roof Nailing | Passed | All trusses and floor joists are properly secured to the top plate with H2.5 clips. All plywood sheathing is secured to the joists and trusses per plan details. Okay to proceed. | |
06/17/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall. | |
06/17/2024 | COT - RSPL - Yard Water Line | Passed | Main water line is connected to water meter and under street pressure. Okay to proceed. | |
07/03/2024 | COT - RSBU - Interior Shear Bracing | Passed | 7/3/24: Shear walls are properly screwed per plan requirements. Okay to proceed with tape, texture, and paint. | |
08/16/2024 | BULD - Electrical Clearance | Passed | Okay to install meter and energize panel. ECO Clearance issued for 7445 E Keller Lane to TEP. | |
08/22/2024 | COT - RSPL - Sewer | Passed | ||
09/13/2024 | RSBU - Building Progress | Passed | Contractor has opened up walls in garage at water supply line, plumber has installed 18+ inches of copper pipes from pex line to first solder joint to meet install requirements. | |
09/26/2024 | COT - RSEL - Electrical Final | Passed | ||
09/26/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
09/26/2024 | COT - RSME - Mechanical Final | Passed | ||
09/26/2024 | COT - RSPL - Plumbing Final | Passed | ||
09/26/2024 | ENGR Engineering Final | Passed | Cut down clean outs to be as close to flush with final landscaping as possible. | |
09/26/2024 | RSBU - Building Final | Passed |