Permit: TC-MDP-1023-01689
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
6180 E CAMPOLINA TR
Address NEW:
6180 E CAMPOLINA TR
Apply Date:
10/23/2023
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan
Permit Reviews
Permit Number - TC-MDP-1023-01689
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/24/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/31/2023 | REQUIRES RESUBMIT |
| 02/29/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.3 | 03/18/2024 | APPROVED |
| 08/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/29/2025 | APPROVED |
| 10/31/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 11/01/2023 | REQUIRES RESUBMIT |
| 10/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 10/30/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-1023-01689
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan
| Date | Description | Comments |
|---|---|---|
| 10/24/2023 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/24/2023 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/03/2023 | Post-Tension Inspection Report is required. | |
| 08/23/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/07/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01689
Permit Description: Blackhawk H30K Model Plan
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/18/2025 | COT - RSPL - Yard Water Line | Passed | 9.18.2025 Okay to backfill, shading required. |
|
| 09/18/2025 | COT - RSPL - Sewer | Passed | ||
| 09/18/2025 | COT - RSPL - Rough Soil | Passed | ||
| 09/25/2025 | BULD - Electrical Clearance | Passed | 9.25.25 APPROVED |
|
| 09/25/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Loose debris was addressed on site for normal knocked in dirt from foot traffic. APPROVED |
|
| 09/25/2025 | COT - RSBU - Preslab | Passed | 9.25.25 APPROVED |
|
| 09/25/2025 | COT - RSEL - Electrical Underground | Passed | 9.25.25 APPROVED |
|
| 09/25/2025 | COT - RSEL - Grounding/Bonding | Passed | 9.25.25 APPROVED |
|
| 10/07/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 10/09/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10.9.25 Corrections made |
|
| 10/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 10.22.2025 Approved. Added blocking at four-gang box, sealed penetrations throughout, verified panel schedule against circuits and 20A rated conductor in garage. |
|
| 10/22/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 10/29/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 12/01/2025 | COT - BULD - SWG Clearance | Passed | 12-1-25: okay to install gas meter. Southwest Gas clearance issued. | |
| 12/09/2025 | COT - RSEL - Electrical Final | Passed | 12.9.25 Approved |
|
| 12/09/2025 | COT - RSEL - Outdoor Lighting | Passed | 12.9.25 Approved |
|
| 12/09/2025 | COT - RSME - Mechanical Final | Passed | 12.9.25 Approved |
|
| 12/09/2025 | COT - RSPL - Plumbing Final | Passed | 12.9.25 Approved |
|
| 12/09/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 12/09/2025 | RSBU - Building Final | Passed | 12.9.25 Approved |
|
| 12/09/2025 | RSBU - Building Progress | Passed | 12.9.25 Approved |