Permit: TC-MDP-1023-01672
Permit Details
Status:
Expired
Type:
Model Building Permit
Address:
9721 E GRAY HAWK DR
Address NEW:
9721 E GRAY HAWK DR
Apply Date:
10/20/2023
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35B Model Plan
Permit Reviews
Permit Number - TC-MDP-1023-01672
Permit Status: Expired
Permit Description: Casas del Cerrito H35B Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/06/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 06/07/2024 | APPROVED |
| 02/06/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.2 | 02/13/2024 | APPROVED |
| 08/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.3 | 08/29/2025 | REQUIRES RESUBMIT |
| 12/26/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/30/2024 | REQUIRES RESUBMIT |
| 03/15/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/18/2024 | REQUIRES RESUBMIT |
| 10/23/2023 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 10/27/2023 | REQUIRES RESUBMIT |
Outstanding Activity Conditions
Permit Number - TC-MDP-1023-01672
Permit Status: Expired
Permit Description: Casas del Cerrito H35B Model Plan
Total Outstanding Activity Conditions - 3
| Date | Name |
|---|---|
| 06/07/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
| 06/10/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 06/10/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1023-01672
Permit Status: Expired
Permit Description: Casas del Cerrito H35B Model Plan
| Date | Description | Comments |
|---|---|---|
| 06/10/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 06/10/2024 | Post-Tension Inspection Report is required. | |
| 09/11/2023 | Post-Tension Inspection Report is required. | |
| 06/07/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/18/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 10/18/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/11/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Expired
Permit Number: TC-MDP-1023-01672
Permit Description: Casas del Cerrito H35B Model Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/08/2024 | COT - RSPL - Backwater Valve | Passed | Underground plumbing and backwater valve are connected to main sewer and under a water test. | |
| 11/08/2024 | COT - RSPL - Rough Soil | Passed | Underground plumbing and backwater valve are connected to main sewer and under a water test. | |
| 11/08/2024 | COT - RSPL - Sewer | Passed | Underground plumbing and backwater valve are connected to main sewer and under a water test. | |
| 11/08/2024 | COT - RSPL - Yard Water Line | Passed | Water line is connected to meter and under street pressure. | |
| 11/14/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-14-24, preslab, electrical underground, setbacks, verified as per approved plans. Okay to pour concrete. | |
| 11/14/2024 | COT - RSBU - Preslab | Passed | 11-14-24, preslab verified as per approved plans. Okay to pour concrete. | |
| 11/29/2024 | COT - RSEL - Electrical Underground | Passed | 11-14-24, approved. | |
| 11/14/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-14-24, preslab, electrical underground, electrical grounding,setbacks, verified as per approved plans. Okay to pour concrete. | |
| 11/21/2024 | COT - RSBU - Roof Nailing | Passed | ||
| 11/21/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 11/25/2024 | BULD - Electrical Clearance | Passed | ECO Clearance issued. | |
| 12/05/2024 | COT - RSPL - Gas Pressure Test | Passed | ||
| 12/06/2024 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12/6/24 corrections were made | |
| 12/06/2024 | RSBU - Building Progress | Passed | ||
| 12/16/2024 | COT - RSBU - Interior Shear Bracing | Passed | 12/16/24 pass | |
| 01/24/2025 | COT - BULD - SWG Clearance | Passed | All gas valves are installed on gas pipes to gas appliances. SWG Clearance issued for 9721 E Gray Hawk Dr. | |
| 01/31/2025 | COT - RSEL - Outdoor Lighting | Passed | 1-31-25, approved. | |
| 02/03/2025 | COT - RSEL - Electrical Final | Passed | 2/3/25 pass. | |
| 02/03/2025 | COT - RSME - Mechanical Final | Passed | 2/3/25 pass. | |
| 02/03/2025 | COT - RSPL - Plumbing Final | Passed | 2/3/25 pass. | |
| 02/03/2025 | RSBU - Building Final | Passed | 2/3/25 pass. | |
| 02/03/2025 | ENGR Engineering Final | Passed |