Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/20/2023
Applicant:
Jorge Teran
Description:
Casas del Cerrito H35G Model Plan

Permit Reviews

Permit Number - TC-MDP-1023-01670
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Start Date Submittal Complete Date Status  
06/14/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 06/18/2024 APPROVED Review Details
10/20/2023 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/30/2023 REQUIRES RESUBMIT Review Details
02/06/2024 SITE FROM MODEL PERMIT - PRODUCTION v.2 02/13/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01670
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Total Outstanding Activity Conditions - 1
Date Name
04/23/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-1023-01670
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35G Model Plan
Date Description Comments
06/18/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/23/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/23/2024 Post-Tension Inspection Report is required.
09/11/2023 Post-Tension Inspection Report is required.
04/23/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
10/18/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
10/20/2023 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/11/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01670
Permite Description: Casas del Cerrito H35G Model Plan
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
03/19/2024 COT - RSEL - Grounding/Bonding N/A Not Applicable
04/23/2024 RSBU - Building Progress N/A Not Applicable
07/05/2024 ENGR Engineering Final N/A Not Ready The west side of this property rear lot drainage needs to be moderately graded a little more to ensure that drainage will flow to the front of the yard. The air conditioning unit at the southwest corner of this property is propped up on a large rock on the north side of the pad. This pad should be constructed out of dirt compacted, and then the air conditioning unit placed onto it.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01670
Permit Description: Casas del Cerrito H35G Model Plan
Total Completed Inspections - 19
Date Description Inspector Results Comments
02/29/2024 COT - RSPL - Yard Water Line Passed
03/11/2024 COT - RSPL - Rough Soil Passed Approved rough soil, okay to continue with pre-slab
03/19/2024 BULD - Electrical Clearance Passed
03/19/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
03/19/2024 COT - RSBU - Preslab Passed
03/19/2024 COT - RSEL - Electrical Underground Passed
04/04/2024 COT - RSBU - Exterior Clips/Sheathing Passed
04/04/2024 COT - RSBU - Roof Nailing Passed
04/23/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/23/2024 COT - RSPL - Gas Pressure Test Passed
05/01/2024 COT - RSPL - Sewer Passed 5/1/24: Sewer line is connected to the underground plumbing line. Okay to shade pipes and backfill trench.
05/02/2024 COT - RSBU - Interior Shear Bracing Passed
07/02/2024 COT - BULD - SWG Clearance Passed Approved, SWG Clearance is required for the new gas meter
07/03/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is properly installed and operational per the plan.
07/03/2024 COT - RSME - Mechanical Final Passed Mechanical equipment is installed and operational. Dead front on electrical panel needs to be properly installed so breakers are aligned with edge of opening. All romex wire sleeves used for labeling circuits must be removed from inside of electrical panel. Clean-outs need to be cut down to grade.
07/09/2024 COT - RSPL - Plumbing Final Passed
07/09/2024 RSBU - Building Final Passed
07/09/2024 COT - RSEL - Electrical Final Passed
07/10/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
CDC 49 SIC-2024-06-11_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 49 D1_V1.PDF DOCUMENTS VIEW
CDC 49 SIC-2023-10-20_V1.PDF DOCUMENTS VIEW
CDC AVP RELEASE_V1.PDF DOCUMENTS VIEW