Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
10/18/2023
Applicant:
Celina Rodriguez
Description:
SFR BT1740-130 T22-M0015

Permit Reviews

Permit Number - TC-MDP-1023-01652
Permit Status: Inspections complete
Permit Description: SFR BT1740-130 T22-M0015
Start Date Submittal Complete Date Status  
01/17/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 01/23/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01652
Permit Status: Inspections complete
Permit Description: SFR BT1740-130 T22-M0015
Total Outstanding Activity Conditions - 5
Date Name
01/17/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
01/17/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/17/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
01/22/2024 Post-Tension Inspection Report is required.
11/22/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.

Conditions

Permit Number - TC-MDP-1023-01652
Permit Status: Inspections complete
Permit Description: SFR BT1740-130 T22-M0015
Date Description Comments
10/18/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
11/22/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01652
Permit Description: SFR BT1740-130 T22-M0015
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/14/2024 COT - RSPL - Yard Water Line Passed
02/14/2024 COT - RSPL - Rough Soil Passed
02/22/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/22/2024 COT - RSBU - Preslab Passed
02/22/2024 COT - RSEL - Electrical Underground Passed
02/22/2024 COT - RSEL - Grounding/Bonding Passed
03/18/2024 COT - RSBU - Exterior Clips/Sheathing Passed All clips for roof and base plate are properly installed and secured. All interior shear walls are properly bolted and nailed down to concrete floor. Okay to proceed with exterior stucco application.
03/18/2024 COT - RSBU - Roof Nailing Passed All plywood sheathing for roof is properly nailed off. Okay to proceed with dry in of roof.
04/18/2024 COT - RSPL - Gas Pressure Test Passed
04/18/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/10/2024 COT - RSBU - Interior Shear Bracing Passed Drywall for interior shear walls is properly installed and secured to studs per plan requirements. Okay to proceed with tape, texture, and painting of walls and ceilings.
07/15/2024 COT - BULD - SWG Clearance Passed SWG for meter only
07/22/2024 COT - RSPL - Sewer Passed 7/22/24: Underground plumbing is connected to sewer and under a water pressure test with no leaks in piping or joints. Okay to shade pipe and backfill trench.
07/24/2024 BULD - Electrical Clearance Passed Okay to energize panel. ECO Clearance issued to TEP for 4647 S. Brandywine Dr.
08/26/2024 COT - RSEL - Electrical Final Passed Construction is complete. All utilities are connected and operational. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI Breakers installed as required. Outdoor lighting is properly installed per plan and city requirements.
08/26/2024 COT - RSEL - Outdoor Lighting Passed Outdoor lighting is is properly installed per plan and city regulations.
08/26/2024 COT - RSME - Mechanical Final Passed Construction is complete. All utilities are connected and operational. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI Breakers installed as required. Outdoor lighting is properly installed per plan and city requirements.
08/26/2024 COT - RSPL - Plumbing Final Passed Construction is complete. All utilities are connected and operational. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI Breakers installed as required. Outdoor lighting is properly installed per plan and city requirements.
08/26/2024 RSBU - Building Final Passed Construction is complete. All utilities are connected and operational. Mechanical, electrical, and plumbing fixtures are properly installed and operational. Electrical panel is properly labeled with AFCI & GFCI Breakers installed as required. Outdoor lighting is properly installed per plan and city requirements. Okay to issue Certificate of Occupancy.
08/26/2024 RSBU - Building Progress Passed
08/29/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 34 START_V1.PDF DOCUMENTS VIEW
BTIII 34 SIC-2024-01-17_V1.PDF DOCUMENTS VIEW