Inspection Status: Re-inspection required
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/26/2024 | ENGR Engineering Final | Re-inspection required | Drainage is blocked on the right side of home at the gate from continuing to the front. Nursery stake must be removed. Clean outs need to be cut down to grade. Sewer clean out in driveway needs to be completed. |
|
| 08/29/2024 | ENGR Engineering Final | Passed |