Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
4019 E 22ND ST
Address NEW:
4019 E 22ND ST
Apply Date:
10/13/2023
Applicant:
Ramon VALDEZ
Description:
DUPLEX DUPLVAL82 T22-M0037

Permit Reviews

Permit Number - TC-MDP-1023-01630
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Start Date Submittal Complete Date Status  
10/16/2023 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/23/2023 APPROVED Review Details

Conditions

Permit Number - TC-MDP-1023-01630
Permit Status: Complete
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Date Description Comments
10/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-1023-01630
Permit Description: DUPLEX DUPLVAL82 T22-M0037
Total Completed Inspections - 18
Date Description Inspector Results Comments
10/31/2023 COT - RSPL - Rough Soil Passed
10/31/2023 COT - RSPL - Sewer Passed 10/30/23: two way clean out missing at sewer connection to first duplex, rough plumb water testing shall be tested to a point no less then 5ft or from the highest point in the completed system. (P2503.5.1)
10/31/23: passed
11/02/2023 COT - RSEL - Grounding/Bonding Passed
11/20/2023 COT - RSBU - Roof Nailing Passed
11/22/2023 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Plumbing is under water test without leaks. Okay to insulate and drywall interior walls.
11/22/2023 BULD - Electrical Clearance Passed ECO clearance issued for both units 4019 E 22nd St. Unit #1 and Unit # 2. Okay to energize panels.
11/22/2023 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11/22/23: contractor has corrected items from the 11/20/23 inspection. Okay to insulate and drywall interior walls.
01/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
01/29/2024 COT - RSBU - Interior Shear Bracing Passed
01/29/2024 COT - RSBU - Preslab Passed
01/29/2024 COT - RSME - Mechanical Final Passed
01/29/2024 COT - RSEL - Outdoor Lighting Passed
01/29/2024 COT - RSEL - Electrical Final Passed
01/29/2024 COT - RSPL - Plumbing Final Passed
01/29/2024 COT - RSPL - Yard Water Line Passed
01/29/2024 RSBU - Building Final Passed
01/29/2024 RSBU - Building Progress Passed
01/29/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
4019 SITE PLAN_V1.PDF DOCUMENTS VIEW