Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
01/30/2024
Applicant:
Description:
VC 1465-130

Permit Reviews

Permit Number - TC-MDP-1023-01622
Permit Status: Inspections complete
Permit Description: VC 1465-130
Start Date Submittal Complete Date Status  
01/30/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/02/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-1023-01622
Permit Status: Inspections complete
Permit Description: VC 1465-130
Total Outstanding Activity Conditions - 5
Date Name
01/30/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
01/30/2024 Post-Installed Anchor Inspection Report is required.
01/30/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
04/03/2023 Post-Tension Inspection Report is required.
04/03/2023 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-1023-01622
Permit Status: Inspections complete
Permit Description: VC 1465-130
Date Description Comments
02/02/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
10/13/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01622
Permite Description: VC 1465-130
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
05/30/2024 COT - BULD - SWG Clearance N/A Re-inspection required 5/30/24: gas piping must be grounded/bonded, shut off valves missing at appliances. Not ready

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01622
Permit Description: VC 1465-130
Total Completed Inspections - 22
Date Description Inspector Results Comments
02/21/2024 COT - RSPL - Backwater Valve Passed
02/21/2024 COT - RSPL - Rough Soil Passed
02/21/2024 COT - RSPL - Sewer Passed
02/21/2024 COT - RSPL - Yard Water Line Passed
02/28/2024 COT - RSBU - Preslab Passed
02/28/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
02/28/2024 COT - RSEL - Electrical Underground Passed
03/25/2024 COT - RSBU - Roof Nailing Passed
03/25/2024 COT - RSBU - Exterior Clips/Sheathing Passed
04/12/2024 COT - RSEL - Grounding/Bonding Passed
04/12/2024 COT - RSPL - Gas Pressure Test Passed
04/17/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/24/2024 BULD - Electrical Clearance Passed
04/24/2024 COT - RSBU - Interior Shear Bracing Passed
06/04/2024 COT - BULD - SWG Clearance Passed
06/14/2024 COT - RSEL - Electrical Final Passed
06/14/2024 COT - RSEL - Outdoor Lighting Passed
06/14/2024 COT - RSME - Mechanical Final Passed
06/14/2024 COT - RSPL - Plumbing Final Passed
06/14/2024 ENGR Engineering Final Passed Side gate missing at this time, is scheduled for install possibly this week
06/14/2024 RSBU - Building Final Passed
06/14/2024 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
RVC 25 SIC-2024-01-30_V1.PDF DOCUMENTS VIEW
VALENCIA CROSSING - LOT 25 START_V1.PDF DOCUMENTS VIEW