Permit: TC-MDP-1023-01620
Permit Details
Apply Date:
10/17/2023
Applicant:
Description:
VC 1465-130
Permit Reviews
Permit Number - TC-MDP-1023-01620
Permit Status: Inspections complete
Permit Description: VC 1465-130
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
10/17/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/23/2023 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-1023-01620
Permit Status: Inspections complete
Permit Description: VC 1465-130
Total Outstanding Activity Conditions - 5
Date | Name |
---|---|
04/03/2023 | Post-Tension Inspection Report is required. |
04/03/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
08/11/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. |
10/17/2023 | Post-Installed Anchor Inspection Report is required. |
10/17/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-1023-01620
Permit Status: Inspections complete
Permit Description: VC 1465-130
Date | Description | Comments |
---|---|---|
10/23/2023 | Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact. | |
08/11/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
10/13/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01620
Permite Description: VC 1465-130
Total Outstanding Inspections - 5
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
12/22/2023 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Re-inspection required | Attic access requirements not met, missing 1.5" VTR for kitchen sink per plans. Insulation has been installed before passing intermediate. Remove ALL insulation from house. |
01/02/2024 | COT - RSBU - Interior Shear Bracing | N/A | Re-inspection required | Cancelled per Karl. 1/2/24: no plans on site. |
01/02/2024 | BULD - Electrical Clearance | N/A | Not Ready | 1/2/24: Not ready |
03/06/2024 | COT - RSME - Mechanical Final | N/A | Not Ready | Mechanical vent in master not installed, landscaping grade 3/6/24: Not ready |
03/06/2024 | RSBU - Building Final | N/A | Not Ready | Mechanical vent in master not installed, landscaping grade 3/6/24: Not ready |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-1023-01620
Permit Description: VC 1465-130
Total Completed Inspections - 20
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
11/07/2023 | COT - RSPL - Rough Soil | Passed | ||
11/07/2023 | COT - RSPL - Sewer | Passed | ||
11/07/2023 | COT - RSPL - Yard Water Line | Passed | ||
11/09/2023 | COT - RSEL - Electrical Underground | Passed | ||
11/09/2023 | COT - RSEL - Grounding/Bonding | Passed | ||
11/13/2023 | COT - RSBU - Preslab | Passed | ||
11/14/2023 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
11/29/2023 | COT - RSBU - Exterior Clips/Sheathing | Passed | 11/29/23: All items from the 11/24/23 have been corrected. Okay to proceed with exterior dry-in of walls and roof. | |
11/29/2023 | COT - RSBU - Roof Nailing | Passed | 11/29/23: All items from the 11/24/23 have been corrected. Okay to proceed with exterior dry-in of walls and roof. | |
12/20/2023 | COT - RSPL - Gas Pressure Test | Passed | ||
01/03/2024 | COT - RSBU - Interior Shear Bracing | Passed | 1/3/2024. Approved. | |
01/08/2024 | BULD - Electrical Clearance | Passed | ||
02/07/2024 | COT - BULD - SWG Clearance | Passed | ||
03/01/2024 | COT - RSEL - Electrical Final | Passed | ||
03/01/2024 | COT - RSEL - Outdoor Lighting | Passed | ||
03/01/2024 | COT - RSPL - Plumbing Final | Passed | ||
03/01/2024 | RSBU - Building Progress | Passed | ||
03/08/2024 | COT - RSME - Mechanical Final | Passed | ||
03/08/2024 | RSBU - Building Final | Passed | ||
03/08/2024 | ENGR Engineering Final | Passed |