Permit: TC-MDP-0925-00548
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
2447 S CAMPBELL AV UNIT 1
Address NEW:
2447 S CAMPBELL AV UNIT 1
Apply Date:
10/06/2025
Applicant:
Charles Corrales
Description:
REV1: Site Entrance has been revised to meet DTM comments Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Permit Reviews
Permit Number - TC-MDP-0925-00548
Permit Status: Inspections complete
Permit Description: REV1: Site Entrance has been revised to meet DTM comments
Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/06/2026 | SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 | 02/23/2026 | REQUIRES RESUBMIT |
| 10/06/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 11/04/2025 | REQUIRES RESUBMIT |
| 01/08/2026 | ADMINISTRATIVE v.1 | 01/08/2026 | REQUIRES RESUBMIT |
| 02/05/2026 | ADMINISTRATIVE v.1 | 02/05/2026 | APPROVED |
| 02/25/2026 | SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.2 | 03/19/2026 | APPROVED |
| 02/02/2026 | ADMINISTRATIVE v.2 | 02/02/2026 | REQUIRES RESUBMIT |
| 12/09/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 01/08/2026 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0925-00548
Permit Status: Inspections complete
Permit Description: REV1: Site Entrance has been revised to meet DTM comments
Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/15/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Conditions
Permit Number - TC-MDP-0925-00548
Permit Status: Inspections complete
Permit Description: REV1: Site Entrance has been revised to meet DTM comments
Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
| Date | Description | Comments |
|---|---|---|
| 09/15/2025 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 09/15/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/20/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00548
Permit Description: REV1: Site Entrance has been revised to meet DTM comments
Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Completed Inspections - 16
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/11/2026 | COT - RSPL - Rough Soil | Passed | 2.11.26 Approved, ok to backfill |
|
| 02/13/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 2/12/26 | |
| 02/13/2026 | COT - RSBU - Preslab | Passed | Passed 2/12/26 | |
| 02/13/2026 | COT - RSPL - Yard Water Line | Passed | Passed 2/12/26 | |
| 02/23/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 02/23/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 03/09/2026 | BULD - Electrical Clearance | Passed | 03/09/2026 Approved clearance TEP ECO. |
|
| 03/09/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | ||
| 03/13/2026 | COT - RSBU - Interior Shear Bracing | Passed | 3-13-26: drywall screw inspection approved-okay for tape & texture. | |
| 08/03/2026 | COT - RSME - Mechanical Final | Passed | ||
| 08/03/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 08/03/2026 | COT - RSEL - Electrical Final | Passed | ||
| 08/03/2026 | RSBU - Building Final | Passed | ||
| 08/03/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 08/11/2026 | COT - RSPL - Sewer | Passed | ||
| 08/12/2026 | ENGR Engineering Final | Passed | Appropriate thresholds are installed, sewer clean-outs are cut to acceptable height, parking block pins are driven, exposed pvc is painted. Site is complete in accordance with approved plans. |