Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
09/15/2025
Applicant:
David Evans
Description:
Greenhill grande duplex (Model master plan TC-MDP-1223-01917)

Permit Reviews

Permit Number - TC-MDP-0925-00546
Permit Status: Complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Start Date Submittal Complete Date Status  
02/18/2026 BUILDING DEFERRED SUBMITTAL REVIEW v.1 02/20/2026 APPROVED Review Details
09/16/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 10/02/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0925-00546
Permit Status: Complete
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Date Description Comments
09/15/2025 Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512
10/03/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/15/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/15/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/30/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0925-00546
Permite Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
10/23/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing N/A Re-inspection required 10.23.25
Missing anchor bolts as marked
Missing shot pins as marked
10/23/2025 COT - RSBU - Interior Shear Bracing N/A Not Ready
10/23/2025 COT - RSBU - Roof Nailing N/A Not Ready 10.23.25
Improper fastener depth at sheathing (over penetration)
11/10/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass 1-Seal hole in top plate.
2-Fill in concrete under tub.
3-complete Home runs to services, and install Grounding Electrode Conductors.

OK to cover all except service corrections.
10/09/2025 COT - RSEL - Electrical Underground N/A Not Applicable Damen Coons 4/21/2026- Status-NA

Partial pass. UFER in place. Pending tie into panel. 10/9/2025
12/16/2025 ENGR Engineering Final N/A Failed Site improvements under construction. Due to site construction being performed without inspection, a letter from the Engineer of Record accepting the work including compaction and paving will be required.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0925-00546
Permit Description: Greenhill grande duplex (Model master plan TC-MDP-1223-01917)
Total Completed Inspections - 18
Date Description Inspector Results Comments
10/06/2025 COT - RSPL - Rough Soil Passed
10/09/2025 COT - RSBU - Preslab Passed Okay for concrete placement. 10/9/2025
10/09/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Okay for concrete placement. 10/9/2025
10/09/2025 RSPL - Plumbing Progress Passed
10/27/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/27/2025 COT - RSBU - Interior Shear Bracing Passed
10/27/2025 COT - RSBU - Roof Nailing Passed
10/27/2025 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
10/30/2025 COT - RSPL - Sewer Passed
12/16/2025 BULD - Electrical Clearance Passed 12/16/25
TEP CLEARANCE: ECO unit A/B
12/16/2025 COT - RSPL - Yard Water Line Passed
01/22/2026 COT - RSEL - Electrical Final Passed 1.22.26
Approved
01/22/2026 COT - RSME - Mechanical Final Passed 1.22.26
Approved
01/22/2026 COT - RSPL - Plumbing Final Passed
01/22/2026 RSBU - Building Final Passed 1.22.26
Approved
04/21/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
05/05/2026 ENGR Engineering Final Passed
05/05/2026 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
29TH FINAL_COVER SHEET_V1.PDF DOCUMENTS VIEW
29TH NARRATIVE BUILDING 3 9-15-2025.DOCX_V1.PDF DOCUMENTS VIEW