Inspection Status: Failed
Inspection History: ENGR Engineering Final
| Date |
Description |
Inspector |
Results |
Comments |
| 01/22/2026 |
ENGR Engineering Final
|
|
Failed |
Contractor has failed to provide any requested documentation for construction of TD-DEV-0425-00125. Due to site construction being performed without inspection, a letter from the Engineer of Record accepting the work including compaction and paving will be required prior to acceptance of any related work or permits. |
| 04/21/2026 |
ENGR Engineering Final
|
|
Not Ready |
3101 does not comply with an inclusive home design ordinance. Landing in front of accessible route entrance of home is over 2%. If you have any questions, give me a call. 520 850 7231 |
| 05/05/2026 |
ENGR Engineering Final
|
|
Passed |
|
| 12/16/2025 |
ENGR Engineering Final
|
|
Failed |
Site improvements under construction. Due to site construction being performed without inspection, a letter from the Engineer of Record accepting the work including compaction and paving will be required. |