Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
7657 S BEST MATE PL
Apply Date:
09/09/2025
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)

Permit Reviews

Permit Number - TC-MDP-0925-00537
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Start Date Submittal Complete Date Status  
11/24/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 11/26/2025 APPROVED Review Details
09/09/2025 SITE FROM MODEL PERMIT - SUBDIVISION v.1 09/18/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0925-00537
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Total Outstanding Activity Conditions - 2
Date Name
09/05/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/05/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Conditions

Permit Number - TC-MDP-0925-00537
Permit Status: Inspections complete
Permit Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Date Description Comments
09/19/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/11/2025 Post-Installed Anchor Inspection Report is required.
09/05/2025 Post-Tension Inspection Report is required.
09/05/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/11/2025 SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00537
Permit Description: Blackhawk H30K Model Plan (Model Master Plan TC-MDP-0823-01435)
Total Completed Inspections - 21
Date Description Inspector Results Comments
10/06/2025 COT - RSPL - Sewer Passed
10/06/2025 COT - RSPL - Rough Soil Passed
10/13/2025 BULD - Electrical Clearance Passed
10/13/2025 COT - RSEL - Electrical Underground Passed
10/13/2025 COT - RSEL - Grounding/Bonding Passed
10/16/2025 COT - RSBU - Preslab Passed 10.16.25
Passed
10/16/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
10/28/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 10.28.2025
Corrections made to prior inspection and bracing on trusses verified.
10/28/2025 COT - RSBU - Roof Nailing Passed 10.28.2025
Corrections made to prior inspection and bracing on trusses verified.
11/05/2025 COT - RSPL - Gas Pressure Test Passed 11.05.2025
Approved and holding under test.
11/06/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11.06.2025
Corrections made to prior inspection and holding under test.
11/17/2025 COT - RSPL - Yard Water Line Passed 11.17.2025
Under test and holding to meter with blue tracer wire - okay to backfill with shading materials.
11/17/2025 COT - RSBU - Interior Shear Bracing Passed
12/16/2025 COT - BULD - SWG Clearance Passed 12/16/2025
Clearance to Southwest Gas.
12/22/2025 COT - RSEL - Electrical Final Passed
12/22/2025 COT - RSEL - Outdoor Lighting Passed
12/22/2025 COT - RSME - Mechanical Final Passed 12/22/2025
Verified repaired and connected outlet in attic to air handler.
12/22/2025 COT - RSPL - Plumbing Final Passed
12/22/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
12/22/2025 RSBU - Building Final Passed 12/22/2025
Verified repaired and connected outlet in attic to air handler. Painted exposed plastic pipes.
12/22/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
BHK 105 SIC-2025-11-20_V1.PDF DOCUMENTS VIEW
BHK 105 D1_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 105 SIC-2025-09-09_V1.PDF DOCUMENTS VIEW