Permit: TC-MDP-0925-00534
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
7645 S BEST MATE PL
Address NEW:
7645 S BEST MATE PL
Apply Date:
09/05/2025
Applicant:
Helen Ormsby
Description:
Blackhawk H30D Model Plan (Model master plan TC-MDP-0823-01433) REV_3
Permit Reviews
Permit Number - TC-MDP-0925-00534
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan (Model master plan TC-MDP-0823-01433) REV_3
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/02/2025 | APPROVED |
| 09/05/2025 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 09/12/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0925-00534
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan (Model master plan TC-MDP-0823-01433) REV_3
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/05/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0925-00534
Permit Status: Inspections complete
Permit Description: Blackhawk H30D Model Plan (Model master plan TC-MDP-0823-01433) REV_3
| Date | Description | Comments |
|---|---|---|
| 09/08/2025 | Post-Installed Anchor Inspection Report is required. | |
| 09/05/2025 | Post-Tension Inspection Report is required. | |
| 09/05/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/08/2025 | SPECIAL INSPECTION FOR SITE PREPARATION IS REQUIRED. | |
| 09/05/2025 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0925-00534
Permit Description: Blackhawk H30D Model Plan (Model master plan TC-MDP-0823-01433) REV_3
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/03/2025 | COT - RSPL - Rough Soil | Passed | ||
| 10/10/2025 | COT - RSBU - Preslab | Passed | ||
| 10/10/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 10/10/2025 | BULD - Electrical Clearance | Passed | ||
| 10/10/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 10/10/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 10/27/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 10/27/2025 | COT - RSPL - Sewer | Passed | 10.27.2025 Approved, passed underground 10.3.2025. |
|
| 10/29/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 10.29.2025 Corrections made to prior inspection. |
|
| 11/04/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 11.04.2025 Approved per plan. |
|
| 11/04/2025 | COT - RSPL - Gas Pressure Test | Passed | 11.04.2025 Approved and under test. |
|
| 11/13/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed 11/13/25 | |
| 11/17/2025 | COT - RSPL - Yard Water Line | Passed | 11.17.2025 Under test and holding to meter with blue tracer wire - okay to backfill with shading materials. |
|
| 12/12/2025 | COT - BULD - SWG Clearance | Passed | 12.12.25 Approved for SWG |
|
| 12/17/2025 | COT - RSME - Mechanical Final | Passed | ||
| 12/17/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 12/17/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 12/17/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 12/17/2025 | RSBU - Building Progress | Passed | ||
| 12/19/2025 | COT - RSEL - Electrical Final | Passed | 12/19/2025 All corrections made. |
|
| 12/19/2025 | RSBU - Building Final | Passed | 12/19/2025 All corrections made. |