Permit: TC-MDP-0924-01136
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
6135 E CAMPOLINA TR
Address NEW:
6135 E CAMPOLINA TR
Apply Date:
09/26/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30K Model Plan
Permit Reviews
Permit Number - TC-MDP-0924-01136
Permit Status: Inspections
Permit Description: Blackhawk H30K Model Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/27/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/03/2024 | APPROVED |
| 08/29/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/29/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0924-01136
Permit Status: Inspections
Permit Description: Blackhawk H30K Model Plan
Total Outstanding Activity Conditions - 4
| Date | Name |
|---|---|
| 09/26/2024 | Post-Tension Inspection Report is required. |
| 10/02/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 10/02/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 10/02/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0924-01136
Permit Status: Inspections
Permit Description: Blackhawk H30K Model Plan
| Date | Description | Comments |
|---|---|---|
| 11/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/02/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01136
Permite Description: Blackhawk H30K Model Plan
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| COT - RSBU - Interior Shear Bracing | N/A | Requested |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01136
Permit Description: Blackhawk H30K Model Plan
Total Completed Inspections - 11
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/01/2026 | COT - RSPL - Backwater Valve | Passed | ||
| 04/01/2026 | COT - RSPL - Rough Soil | Passed | 4.1.26 Approved |
|
| 04/01/2026 | COT - RSPL - Sewer | Passed | ||
| 04/01/2026 | COT - RSPL - Yard Water Line | Passed | 4.1.26 Approved |
|
| 04/08/2026 | BULD - Electrical Clearance | Passed | 04/08/2026 Clearance TEP ECO. |
|
| 04/10/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 04/10/2026 Approved, ok for concrete placement. |
|
| 04/10/2026 | COT - RSBU - Preslab | Passed | 04/10/2026 Approved, ok for concrete placement. |
|
| 04/24/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 04/24/2026 Corrections made to prior inspection. |
|
| 04/24/2026 | COT - RSBU - Roof Nailing | Passed | 04/24/2026 Corrections made to prior inspection. |
|
| 05/05/2026 | RSBU - Building Progress | Passed | ||
| 05/06/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5.6.26 Approved |