Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 08/21/2026 | ENGR Engineering Final | Not Ready | HCS cap collar is not glued to pipe correctly in driveway. DG needs to spread or yard gate fitted correctly for gate to function. Drain block next to AC pedestal needs to be cleared. PVC clean out caps need to be painted by front entryway. -Outstanding condition special grading and filling needs to be satisfied prior to final inspections. |
|
| 08/26/2026 | ENGR Engineering Final | Passed |