Permit: TC-MDP-0924-01130
Permit Details
Status:
Inspections
Type:
Model Building Permit
Address:
6147 E CAMPOLINA TR
Address NEW:
6147 E CAMPOLINA TR
Apply Date:
09/26/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)
Permit Reviews
Permit Number - TC-MDP-0924-01130
Permit Status: Inspections
Permit Description: Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 04/16/2026 | SPECIAL INSPECTION REVIEW v.1 | 04/16/2026 | APPROVED |
| 08/28/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/28/2025 | APPROVED |
| 09/27/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/02/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0924-01130
Permit Status: Inspections
Permit Description: Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 09/30/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0924-01130
Permit Status: Inspections
Permit Description: Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)
| Date | Description | Comments |
|---|---|---|
| 09/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/26/2024 | Post-Tension Inspection Report is required. | |
| 11/07/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
| 09/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 11/07/2023 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. | |
| 09/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01130
Permite Description: Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/11/2026 | ENGR Engineering Final | N/A | Re-inspection required | West side drain blocks have been covered, there is not positive drainage out of the back yard. Need to show positive drainage for the entire site without crossing onto adjacent sites. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01130
Permit Description: Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/13/2026 | COT - RSPL - Backwater Valve | Passed | ||
| 02/13/2026 | COT - RSPL - Rough Soil | Passed | 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED | |
| 02/13/2026 | COT - RSPL - Sewer | Passed | 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED | |
| 02/13/2026 | COT - RSPL - Yard Water Line | Passed | 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED | |
| 02/20/2026 | BULD - Electrical Clearance | Passed | 2.20.26 Approved |
|
| 02/20/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 2.20.26 Approved |
|
| 02/20/2026 | COT - RSBU - Preslab | Passed | 2.20.26 Approved |
|
| 02/20/2026 | COT - RSEL - Electrical Underground | Passed | 2.20.26 Approved |
|
| 02/20/2026 | COT - RSEL - Grounding/Bonding | Passed | 2.20.26 Approved |
|
| 03/20/2026 | COT - RSBU - Roof Nailing | Passed | ||
| 03/23/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 3.23.26 Corrections implemented, approved to proceed |
|
| 03/31/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 3.31.26 Approved |
|
| 03/31/2026 | COT - RSPL - Gas Pressure Test | Passed | 3.31.26 Approved |
|
| 04/10/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 05/13/2026 | COT - BULD - SWG Clearance | Passed | 5.13.26 Approved for SWG |
|
| 06/11/2026 | RSBU - Building Final | Passed | ||
| 06/11/2026 | RSBU - Building Progress | Passed | ||
| 06/11/2026 | COT - RSEL - Electrical Final | Passed | ||
| 06/11/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 06/11/2026 | COT - RSME - Mechanical Final | Passed | ||
| 06/11/2026 | COT - RSEL - Outdoor Lighting | Passed |