Permit Details

Status:
Inspections
Type:
Model Building Permit
Address NEW:
6147 E CAMPOLINA TR
Apply Date:
09/26/2024
Applicant:
Helen Ormsby
Description:
Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)

Permit Reviews

Permit Number - TC-MDP-0924-01130
Permit Status: Inspections
Permit Description: Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)
Start Date Submittal Complete Date Status  
04/16/2026 SPECIAL INSPECTION REVIEW v.1 04/16/2026 APPROVED Review Details
08/28/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/28/2025 APPROVED Review Details
09/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/02/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01130
Permit Status: Inspections
Permit Description: Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)
Total Outstanding Activity Conditions - 1
Date Name
09/30/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0924-01130
Permit Status: Inspections
Permit Description: Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)
Date Description Comments
09/30/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/30/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/26/2024 Post-Tension Inspection Report is required.
11/07/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
09/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
11/07/2023 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy.
09/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/30/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0924-01130
Permite Description: Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
06/11/2026 ENGR Engineering Final N/A Re-inspection required West side drain blocks have been covered, there is not positive drainage out of the back yard. Need to show positive drainage for the entire site without crossing onto adjacent sites.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0924-01130
Permit Description: Blackhawk H30M Model Plan (Model Master Plan TC-MDP-0823-01436)
Total Completed Inspections - 21
Date Description Inspector Results Comments
02/13/2026 COT - RSPL - Backwater Valve Passed
02/13/2026 COT - RSPL - Rough Soil Passed 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED
02/13/2026 COT - RSPL - Sewer Passed 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED
02/13/2026 COT - RSPL - Yard Water Line Passed 2/13/26: PLUMBING UNDERGROUND/ SEWER CONNECTION/ MAIN WATER LINE HAVE ALL BE INSTALLED PER APPROVED PLANS. OK TO PROCEED WITH BACKFILL. SHADING REQUIRED
02/20/2026 BULD - Electrical Clearance Passed 2.20.26
Approved
02/20/2026 COT - RSBU - Excavation/Rebar/Zoning Passed 2.20.26
Approved
02/20/2026 COT - RSBU - Preslab Passed 2.20.26
Approved
02/20/2026 COT - RSEL - Electrical Underground Passed 2.20.26
Approved
02/20/2026 COT - RSEL - Grounding/Bonding Passed 2.20.26
Approved
03/20/2026 COT - RSBU - Roof Nailing Passed
03/23/2026 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 3.23.26
Corrections implemented, approved to proceed
03/31/2026 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 3.31.26
Approved
03/31/2026 COT - RSPL - Gas Pressure Test Passed 3.31.26
Approved
04/10/2026 COT - RSBU - Interior Shear Bracing Passed
05/13/2026 COT - BULD - SWG Clearance Passed 5.13.26
Approved for SWG
06/11/2026 RSBU - Building Final Passed
06/11/2026 RSBU - Building Progress Passed
06/11/2026 COT - RSEL - Electrical Final Passed
06/11/2026 COT - RSPL - Plumbing Final Passed
06/11/2026 COT - RSME - Mechanical Final Passed
06/11/2026 COT - RSEL - Outdoor Lighting Passed

Documents

File Name Document Type  
BHK 26 SIC-2026-04-14_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BHK 26 SIC-2024-09-26_V1.PDF DOCUMENTS VIEW
CONS-BHK 26 D1_V1.PDF DOCUMENTS VIEW