Permit: TC-MDP-0924-01129
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
9804 E GRAY HAWK DR
Address NEW:
9804 E GRAY HAWK DR
Apply Date:
09/26/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35B Plan
Permit Reviews
Permit Number - TC-MDP-0924-01129
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/27/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/02/2024 | APPROVED |
| 02/12/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 02/13/2025 | APPROVED |
| 02/11/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/12/2025 | REQUIRES RESUBMIT |
Conditions
Permit Number - TC-MDP-0924-01129
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
| Date | Description | Comments |
|---|---|---|
| 10/02/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/26/2024 | Post-Tension Inspection Report is required. | |
| 09/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/30/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 09/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01129
Permite Description: Casas del Cerrito H35B Plan
Total Outstanding Inspections - 4
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/06/2025 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | |
| 01/06/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 01/06/25 1. Per sill plate anchor schedule, 16 foot gypsum shear wall requires MASA clips at 22" on center. 2. Northwest wall is missing RSP clip on a 2X4; Sill plate on west side entry door is great than 12" so it needs another anchor bolt; 3. Missing strap at north beam off patio per detail 30. 4. Missing anchor bolt on SE shear wall. 5. North shear wall; tighten down nut on anchor bolt. 6. Sill plate needs shot pins near 2" pvc interior wall bathroom. 7. Blocking on southeast truss is not nailed in, sticking out by almost 2". 8. Master bedroom south wall is missing shot missing every 48". 9. Garage West side Truss is within 3'' of top plate slice. 10. OSB for mechanical landing needs to be secured. 11. Spacing on roof sheathing is greater than 1/8", mostly over garage NW side. |
| 01/06/2025 | BULD - Electrical Clearance | N/A | Not Ready | 01/06/25 Missing riser, grounding. Not ready. |
| 01/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | ok to insulate interior, roof not loaded, must return when roof tiles in place |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01129
Permit Description: Casas del Cerrito H35B Plan
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/16/2024 | COT - RSPL - Rough Soil | Passed | 12/16/24 pass. OK to backfill, shading required. | |
| 12/16/2024 | COT - RSPL - Sewer | Passed | 12/16/24 pass. OK to backfill, shading required. | |
| 12/16/2024 | COT - RSPL - Yard Water Line | Passed | pass | |
| 12/16/2024 | COT - RSPL - Backwater Valve | Passed | 12/16/24 pass. OK to backfill, shading required. | |
| 12/20/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ok to pour concrete 12/20/24 | |
| 12/20/2024 | COT - RSBU - Preslab | Passed | Per plans, ok to pour concrete 12/20/24 | |
| 12/20/2024 | COT - RSEL - Electrical Underground | Passed | Per plans, ok to pour concrete 12/20/24 | |
| 12/20/2024 | COT - RSEL - Grounding/Bonding | Passed | Per plans, ok to pour concrete 12/20/24 | |
| 01/08/2025 | COT - RSBU - Roof Nailing | Passed | 1/8/25: All noted items from 1/6/25 inspection have been corrected and are completed. | |
| 01/08/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/8/25: All noted items from 1/6/25 inspection have been corrected and are completed. | |
| 01/10/2025 | BULD - Electrical Clearance | Passed | 1/10/25 ready for temp power CLEARANCE ECO | |
| 01/22/2025 | COT - RSPL - Gas Pressure Test | Passed | held pressure 1/22/25 | |
| 01/28/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 1/28/25 roof has been loaded. passed inspection | |
| 01/28/2025 | RSBU - Building Progress | Passed | ||
| 02/03/2025 | COT - RSBU - Interior Shear Bracing | Passed | 2/3/25 pass | |
| 03/11/2025 | COT - BULD - SWG Clearance | Passed | 11 March 25 SOUTHWEST GAS CLEARANCE: SWG |
|
| 04/04/2025 | COT - RSEL - Electrical Final | Passed | Passed 4/4/25 | |
| 04/04/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 4/4/25 | |
| 04/04/2025 | COT - RSME - Mechanical Final | Passed | Passed 4/4/25 | |
| 04/04/2025 | COT - RSPL - Plumbing Final | Passed | Passed 4/4/25 | |
| 04/04/2025 | ENGR Engineering Final | Passed | Site is good. C of O ready. | |
| 04/04/2025 | RSBU - Building Final | Passed | Passed 4/4/25 |