Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9822 E GRAY HAWK DR
Apply Date:
09/26/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35B Plan

Permit Reviews

Permit Number - TC-MDP-0924-01128
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Start Date Submittal Complete Date Status  
09/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/02/2024 APPROVED Review Details
03/13/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/17/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01128
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Total Outstanding Activity Conditions - 1
Date Name
09/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0924-01128
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Date Description Comments
10/02/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/30/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/30/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/26/2024 Post-Tension Inspection Report is required.
09/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/30/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/30/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01128
Permit Description: Casas del Cerrito H35B Plan
Total Completed Inspections - 22
Date Description Inspector Results Comments
01/17/2025 COT - RSPL - Backwater Valve Passed 1/17/25: underground plumbing is complete and connected to main sewer line, entire system is under a water test with no leaks, green tracer wire is installed from clean outs to sewer connection, and backwater valve is installed between clean outs. Okay to shade pipes and backfill trenches.
01/17/2025 COT - RSPL - Rough Soil Passed 1/17/25: underground plumbing is complete and connected to main sewer line, entire system is under a water test with no leaks, green tracer wire is installed from clean outs to sewer connection, and backwater valve is installed between clean outs. Okay to shade pipes and backfill trenches.
01/17/2025 COT - RSPL - Sewer Passed 1/17/25: underground plumbing is complete and connected to main sewer line, entire system is under a water test with no leaks, green tracer wire is installed from clean outs to sewer connection, and backwater valve is installed between clean outs. Okay to shade pipes and backfill trenches.
01/17/2025 COT - RSPL - Yard Water Line Passed 1/17/25: Main water line is connected to the city water system with a meter, blue tracer wire is installed, and line is under street pressure.
01/23/2025 BULD - Electrical Clearance Passed 1-23-25, approved. ECO clearance issued to TEP
01/23/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 1-23-25, excavation/rebar and setbacks verified. Okay to pour concrete.
01/23/2025 COT - RSBU - Preslab Passed 1-23-25, preslab,excavation/rebar and setbacks verified. Okay to pour concrete.
01/23/2025 COT - RSEL - Grounding/Bonding Passed 1-23-25, approved
02/03/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 2/3/25 pass
02/03/2025 COT - RSBU - Roof Nailing Passed 2/3/25 pass
02/03/2025 COT - RSEL - Electrical Underground Passed 2/3/25 pass
02/13/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 2-13-25, residential intermediate inspection approved. Okay to continue with construction
02/13/2025 COT - RSPL - Gas Pressure Test Passed 2-13-25, gas pressure test & residential intermediate inspection approved. Okay to continue with construction
02/21/2025 COT - RSBU - Interior Shear Bracing Passed Drywall for interior shear walls is properly attached to the studs per plan requirements for an interior shear wall. Okay to proceed with tape, texture, and paint.
04/04/2025 COT - BULD - SWG Clearance Passed Passed 4/4/25 CLEARANCE SWG
04/18/2025 COT - RSEL - Electrical Final Passed Passed final 4/18/25
04/18/2025 COT - RSEL - Outdoor Lighting Passed Passed final 4/18/25
04/18/2025 COT - RSME - Mechanical Final Passed Passed final 4/18/25
04/18/2025 COT - RSPL - Plumbing Final Passed Passed final 4/18/25
04/18/2025 RSBU - Building Final Passed Passed final 4/18/25
04/18/2025 RSBU - Building Progress Passed Passed final 4/18/25
04/22/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
CDC 29 SIC-2025-03-12_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 29 SIC-2024-09-26_V1.PDF DOCUMENTS VIEW
CONS-CDC 29 D1_V1.PDF DOCUMENTS VIEW