Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
9799 E GRAY HAWK DR
Apply Date:
09/26/2024
Applicant:
Helen Ormsby
Description:
Casas del Cerrito H35B Plan

Permit Reviews

Permit Number - TC-MDP-0924-01127
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Start Date Submittal Complete Date Status  
12/19/2024 BUILDING DEFERRED SUBMITTAL REVIEW v.1 12/19/2024 APPROVED Review Details
09/26/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 10/02/2024 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01127
Permit Status: Inspections complete
Permit Description: Casas del Cerrito H35B Plan
Date Description Comments
10/03/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/27/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/27/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/26/2024 Post-Tension Inspection Report is required.
09/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/27/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.
09/27/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01127
Permite Description: Casas del Cerrito H35B Plan
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
11/26/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass 11/26/24 panel has 21 circuits, not 23 as per plans. Needs revised plans or additional circuits added. Other issues corrected on site, partial pass pending panel corrections

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0924-01127
Permit Description: Casas del Cerrito H35B Plan
Total Completed Inspections - 22
Date Description Inspector Results Comments
10/30/2024 COT - RSPL - Backwater Valve Passed 10-30-24, backwater valve inspection approved. Okay to backfill-provide shading.
10/30/2024 COT - RSPL - Rough Soil Passed 10-30-24, underground plumbing inspection per approved plans. Okay to backfill-provide shading.
10/30/2024 COT - RSPL - Sewer Passed 10-30-24, sewer inspection approved. Okay to backfill-provide shading.
10/30/2024 COT - RSPL - Yard Water Line Passed 10-30-24, main water line inspection approved. Okay to backfill-provide shading.
11/05/2024 BULD - Electrical Clearance Passed
11/05/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
11/05/2024 COT - RSBU - Preslab Passed
11/05/2024 COT - RSEL - Electrical Underground Passed
11/05/2024 COT - RSEL - Grounding/Bonding Passed
11/14/2024 COT - RSBU - Roof Nailing Passed 11-14-24, roof nailing and truss calcs verified as per approved plans.
11/26/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11/26/24 Corrections made
11/26/2024 COT - RSPL - Gas Pressure Test Passed Gas line holds pressure 11/26/24
11/26/2024 RSBU - Building Progress Passed Passed 11/26/24
11/27/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 11/27/24: Electrician added circuits for hot water heater and home run to master bathroom GFCI. Full pass given.
12/06/2024 COT - RSBU - Interior Shear Bracing Passed 12/6/24 pass
01/10/2025 COT - BULD - SWG Clearance Passed Passed CLEARANCE SWG 1/10/25
01/24/2025 COT - RSEL - Electrical Final Passed Mechanical, electrical, and plumbing work is complete per plans. All mechanical, electrical, and plumbing fixtures are properly working GFCI & AFCI breakers or outlets are in place and operational. Outdoor lighting fixtures are installed and functional. Okay to issue Certificate of Occupancy for this permit.
01/24/2025 COT - RSEL - Outdoor Lighting Passed Mechanical, electrical, and plumbing work is complete per plans. All mechanical, electrical, and plumbing fixtures are properly working GFCI & AFCI breakers or outlets are in place and operational. Outdoor lighting fixtures are installed and functional. Okay to issue Certificate of Occupancy for this permit.
01/24/2025 COT - RSME - Mechanical Final Passed Mechanical, electrical, and plumbing work is complete per plans. All mechanical, electrical, and plumbing fixtures are properly working GFCI & AFCI breakers or outlets are in place and operational. Outdoor lighting fixtures are installed and functional. Okay to issue Certificate of Occupancy for this permit.
01/24/2025 COT - RSPL - Plumbing Final Passed Mechanical, electrical, and plumbing work is complete per plans. All mechanical, electrical, and plumbing fixtures are properly working GFCI & AFCI breakers or outlets are in place and operational. Outdoor lighting fixtures are installed and functional. Okay to issue Certificate of Occupancy for this permit.
01/24/2025 RSBU - Building Final Passed Mechanical, electrical, and plumbing work is complete per plans. All mechanical, electrical, and plumbing fixtures are properly working GFCI & AFCI breakers or outlets are in place and operational. Outdoor lighting fixtures are installed and functional. Okay to issue Certificate of Occupancy for this permit.
01/27/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
CDC 14 SIC-2024-12-16_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
CDC 14 SIC-2024-09-26_V1.PDF DOCUMENTS VIEW
CONS-CDC 14 D1_V1.PDF DOCUMENTS VIEW