Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
11/08/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)

Permit Reviews

Permit Number - TC-MDP-0924-01124
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Start Date Submittal Complete Date Status  
11/14/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 11/27/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01124
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Total Outstanding Activity Conditions - 1
Date Name
09/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0924-01124
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Date Description Comments
11/14/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0924-01124
Permite Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
01/10/2025 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required 01/10/25
1. Missing BC6 post caps.
01/30/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass 1/30/25 fire blocking required where there are penetrations in top plates, Add strap at DWV behind shower. I have marked all areas that need attention. Partial pass.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0924-01124
Permit Description: SFR BT1465-130 T22-M0011 (Model master plan TC-MDP-0123-00350)
Total Completed Inspections - 12
Date Description Inspector Results Comments
12/04/2024 COT - RSPL - Rough Soil Passed Underground plumbing is connected to the main sewer line with tracer wire installed. Entire system is under a water test with no leaks. Okay to shade pipe and backfill trenches.
12/04/2024 COT - RSPL - Yard Water Line Passed Main water supply line is connected to meter and under street pressure with no leaks.
12/04/2024 COT - RSPL - Sewer Passed Underground plumbing is connected to the main sewer line with tracer wire installed. Entire system is under a water test with no leaks. Okay to shade pipe and backfill trenches.
12/11/2024 COT - RSBU - Excavation/Rebar/Zoning Passed 12-11-24, grounding/bonding, setbacks, underground electric, preslab all approved. Okay to pour concrete.
12/11/2024 COT - RSBU - Preslab Passed 12-11-24, grounding/bonding, setbacks, underground electric, preslab all approved. Okay to pour concrete.
12/11/2024 COT - RSEL - Electrical Underground Passed 12-11-24, grounding/bonding, setbacks, underground electric, preslab all approved. Okay to pour concrete.
12/11/2024 COT - RSEL - Grounding/Bonding Passed 12-11-24, grounding/bonding, setbacks, underground electric, preslab all approved. Okay to pour concrete.
01/10/2025 COT - RSBU - Roof Nailing Passed passed.
01/13/2025 COT - RSBU - Exterior Clips/Sheathing Passed 1/13/25: All issues from other inspections have been resolved and corrected. Okay to proceed with other work.
01/23/2025 BULD - Electrical Clearance Passed 1-23-25, panel approved to be energized. ECO clearance issued to TEP.
01/30/2025 COT - RSPL - Gas Pressure Test Passed 1/30/25 pass
01/31/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 1/31/25 pass

Documents

File Name Document Type  
BELLA TIERRA PHASE 3 - LOT 54 START_V1.PDF DOCUMENTS VIEW
BTIII 54 SIC-2024-11-08_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW