Permit: TC-MDP-0924-01121
Permit Details
Apply Date:
09/26/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011
Permit Reviews
Permit Number - TC-MDP-0924-01121
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/27/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/02/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0924-01121
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 4
Date | Name |
---|---|
09/26/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
09/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
09/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
09/27/2024 | Post-Tension Inspection Report is required. |
Conditions
Permit Number - TC-MDP-0924-01121
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011
Date | Description | Comments |
---|---|---|
09/26/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01121
Permite Description: SFR BT1465-130 T22-M0011
Total Outstanding Inspections - 4
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/10/2024 | COT - RSPL - Sewer | N/A | Partial Pass | Tracer wire needs to be brought to grade. 10/10/24 |
10/18/2024 | COT - RSEL - Grounding/Bonding | N/A | Partial Pass | Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete. |
11/01/2024 | COT - RSBU - Exterior Clips/Sheathing | N/A | Re-inspection required | 1-24, bearing wall at entry way must be shimmed for intermediate inspection. Bracing missing at truss A-2, properly nail masa clips to sill plates on both south and north sides of residence, add missing pins to interior framing at marked locations. Stopped inspection -additional items may be noted. |
11/01/2024 | COT - RSBU - Roof Nailing | N/A | Re-inspection required | 1-24, bearing wall at entry way must be shimmed for intermediate inspection. Bracing missing at truss A-2, properly nail masa clips to sill plates on both south and north sides of residence, add missing pins to interior framing at marked locations. Stopped inspection -additional items may be noted. |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0924-01121
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 6
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/10/2024 | COT - RSPL - Yard Water Line | Passed | 10/10/24 PASS | |
10/10/2024 | COT - RSPL - Rough Soil | Passed | 10/10/24 OK to backfill, shading required. | |
10/18/2024 | COT - RSPL - Sewer | Passed | 10/18/24: Tracer wire is pulled to the top of clean-out pipe near front entrance. | |
10/18/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete. | |
10/18/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete. | |
10/18/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete. |