Permit Details

Status:
Inspections
Type:
Model Building Permit
Apply Date:
09/26/2024
Applicant:
Celina Rodriguez
Description:
SFR BT1465-130 T22-M0011

Permit Reviews

Permit Number - TC-MDP-0924-01121
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011
Start Date Submittal Complete Date Status  
09/27/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 10/02/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0924-01121
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011
Total Outstanding Activity Conditions - 4
Date Name
09/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
09/27/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/27/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/27/2024 Post-Tension Inspection Report is required.

Conditions

Permit Number - TC-MDP-0924-01121
Permit Status: Inspections
Permit Description: SFR BT1465-130 T22-M0011
Date Description Comments
09/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0924-01121
Permite Description: SFR BT1465-130 T22-M0011
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
10/10/2024 COT - RSPL - Sewer N/A Partial Pass Tracer wire needs to be brought to grade. 10/10/24
10/18/2024 COT - RSEL - Grounding/Bonding N/A Partial Pass Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete.
11/01/2024 COT - RSBU - Exterior Clips/Sheathing N/A Re-inspection required 1-24, bearing wall at entry way must be shimmed for intermediate inspection. Bracing missing at truss A-2, properly nail masa clips to sill plates on both south and north sides of residence, add missing pins to interior framing at marked locations. Stopped inspection -additional items may be noted.
11/01/2024 COT - RSBU - Roof Nailing N/A Re-inspection required 1-24, bearing wall at entry way must be shimmed for intermediate inspection. Bracing missing at truss A-2, properly nail masa clips to sill plates on both south and north sides of residence, add missing pins to interior framing at marked locations. Stopped inspection -additional items may be noted.

Completed Inspections

Permit Status: Inspections
Permit Number: TC-MDP-0924-01121
Permit Description: SFR BT1465-130 T22-M0011
Total Completed Inspections - 6
Date Description Inspector Results Comments
10/10/2024 COT - RSPL - Yard Water Line Passed 10/10/24 PASS
10/10/2024 COT - RSPL - Rough Soil Passed 10/10/24 OK to backfill, shading required.
10/18/2024 COT - RSPL - Sewer Passed 10/18/24: Tracer wire is pulled to the top of clean-out pipe near front entrance.
10/18/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete.
10/18/2024 COT - RSBU - Preslab Passed Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete.
10/18/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, masa clips are spaced 32" apart, hold down straps are placed per the plan, underground electrical conduit is installed for kitchen island, Ufer ground is in place, and all underground plumbing pipes are properly wrapped with foam. Okay to pour concrete.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
BELLA TIERRA PHASE 3 - LOT 51 START 2_V1.PDF DOCUMENTS VIEW
BTIII 51 SIC-2024-09-26_V1.PDF DOCUMENTS VIEW