Permit Reviews

Permit Number - TC-MDP-0924-01108
Permit Status: Complete
Permit Description: CONDOMINIUM PLACITAE2020 T20-M0008 (shell) - BUIDING 9
Start Date Submittal Complete Date Status  
06/03/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.2 06/03/2025 APPROVED Review Details
10/09/2024 COMMERCIAL REVIEW - FULL v.1 10/14/2024 APPROVED Review Details
03/26/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 03/26/2025 REQUIRES RESUBMIT Review Details
01/16/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 01/21/2025 APPROVED Review Details
07/31/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 08/01/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01108
Permit Status: Complete
Permit Description: CONDOMINIUM PLACITAE2020 T20-M0008 (shell) - BUIDING 9
Date Description Comments
10/14/2024 AIR BALANCING REPORT IS REQUIRED.
09/26/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
10/09/2024 Contractor with active Arizona Contractor's License for specified scope of work required prior to issuance of permit. Contractor must have a TDC Online account and be added to the permit as a contact.
09/26/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
09/26/2024 Post-Tension Inspection Report is required.
10/14/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
10/14/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01108
Permite Description: CONDOMINIUM PLACITAE2020 T20-M0008 (shell) - BUIDING 9
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
07/29/2025 COT - BULD - SWG Clearance N/A Not Applicable
07/29/2025 COT - LCPL - Gas Pressure Test N/A Not Applicable
11/06/2024 COT - LCEL - Grounding/Bonding N/A Partial Pass
08/01/2025 ENGR Engineering Final N/A Deferred

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01108
Permit Description: CONDOMINIUM PLACITAE2020 T20-M0008 (shell) - BUIDING 9
Total Completed Inspections - 30
Date Description Inspector Results Comments
11/06/2024 COT - HCPL - Rough Soil Passed
11/06/2024 COT - LCPL - Rough Soil Passed
11/06/2024 COT - LCPL - Sewer Passed
01/13/2025 COT - LCBU - Exterior Clips/Sheathing Passed
01/13/2025 COT - HCBU - Exterior Clips/Sheathing Passed
01/16/2025 COT - LCBU - Excavation/Rebar/Zoning Passed
01/16/2025 COT - LCBU - Preslab Passed
01/22/2025 COT - LCBU - Roof Nailing Passed
05/05/2025 COT - LCPL - Plumbing Above Ceiling Passed
06/03/2025 BULD - Electrical Clearance Passed for apartments 100, 101,102, 103, 104, 105, 200, 201, 202 203, 204, 205
06/10/2025 COT - LCBU - Framing Passed
07/08/2025 COT - LCEL - Electrical Intermediate Passed
07/25/2025 COT - LCPL - Yard Water Line Passed
07/29/2025 COT - LCBU - Building Above Ceiling Passed
07/29/2025 COT - LCPL - Plumbing Final Passed
07/29/2025 COT - LCPL - Plumbing Intermediate Passed
07/29/2025 COT - LCME - Mechanical Intermediate Passed
07/29/2025 COT - LCME - Mechanical Above Ceiling Passed
07/29/2025 COT - LCEL - Grounding/Bonding Passed
07/29/2025 COT - LCEL - Electrical Above Ceiling Passed
07/29/2025 COT - HCBU - Firewall/Fire Barrier/Firestop Passed
07/30/2025 COT - FCON - Alarm - Final Passed
07/30/2025 COT - FCON - Sprinkler - Final Passed
07/30/2025 COT - LCEL - Electrical Underground Passed
07/30/2025 TRSP - ROW - Final/Close-Out Passed
07/31/2025 COT - FCON - Fire - Final Passed
08/01/2025 COT - LCBU - Building Final Passed
08/01/2025 COT - LCME - Mechanical Final Passed
08/01/2025 COT - LCEL - Outdoor Lighting Passed
08/01/2025 COT - LCEL - Electrical Final Passed

Documents

File Name Document Type  
2022 E RIVER_LOFC.PDF DOCUMENTS VIEW
PLACITAESCONDIDABLDG9 SHELL_V1.PDF DOCUMENTS VIEW
151435 PT BLDG 9 COMPLETE 2-2025-03-24_V1-2025-05-30_V2.PDF DOCUMENTS VIEW
151435 PT BLDG 9 COMPLETE-2025-01-09_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
SUB1_SITE_ BUILDING 9 PLACITA ESCONDIDA_V1.PDF DOCUMENTS VIEW