Inspection Status: Not Ready

Inspection History: ENGR Engineering Final

Permit Number - TC-MDP-0924-01108

Inspection Description - ENGR Engineering Final

Inspection Status - Not Ready

Date Description Inspector Results Comments
07/30/2025 ENGR Engineering Final Not Ready 1) all nursery stakes need to be removed and properly staked or no stakes.
2) ADA parking, no signs and running slope is more than 2%.
3) Drainage channel needs to be completed on east side of building.
4) Staircase needs to be painted.
5) southeast corner has a downspout that is damaged at the bottom elbow and the concrete channel looks to be running back to the foundation.
6) Walkway in the same area seams to have more than a 5% slope.
07/31/2025 ENGR Engineering Final Not Ready List from 07/30/25 is being worked on now.
08/01/2025 ENGR Engineering Final Deferred