Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
Permit Number - TC-MDP-0924-01108
Inspection Description - ENGR Engineering Final
Inspection Status - Not Ready
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/30/2025 | ENGR Engineering Final | Not Ready | 1) all nursery stakes need to be removed and properly staked or no stakes. 2) ADA parking, no signs and running slope is more than 2%. 3) Drainage channel needs to be completed on east side of building. 4) Staircase needs to be painted. 5) southeast corner has a downspout that is damaged at the bottom elbow and the concrete channel looks to be running back to the foundation. 6) Walkway in the same area seams to have more than a 5% slope. |
|
| 07/31/2025 | ENGR Engineering Final | Not Ready | List from 07/30/25 is being worked on now. | |
| 08/01/2025 | ENGR Engineering Final | Deferred |