Permit: TC-MDP-0924-01103
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9561 E HARKES DR
Address NEW:
9561 E HARKES DR
Apply Date:
09/23/2024
Applicant:
Brianna Quiroz
Description:
Black Mountain model SFR Escalara
Permit Reviews
Permit Number - TC-MDP-0924-01103
Permit Status: Complete
Permit Description: Black Mountain model SFR Escalara
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/25/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/01/2024 | APPROVED |
| 08/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 08/19/2025 | REQUIRES RESUBMIT |
| 08/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 08/25/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01103
Permit Status: Complete
Permit Description: Black Mountain model SFR Escalara
| Date | Description | Comments |
|---|---|---|
| 10/01/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/27/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/27/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 09/27/2024 | Post-Tension Inspection Report is required. | |
| 09/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/27/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
| 09/27/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01103
Permite Description: Black Mountain model SFR Escalara
Total Outstanding Inspections - 2
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
| 02/25/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01103
Permit Description: Black Mountain model SFR Escalara
Total Completed Inspections - 19
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/25/2025 | COT - RSPL - Rough Soil | Passed | ||
| 02/25/2025 | COT - RSPL - Sewer | Passed | ||
| 03/05/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 3/5/25 Ok to pour concrete | |
| 03/05/2025 | COT - RSBU - Preslab | Passed | Passed 3/5/25 Ok to pour concrete | |
| 03/05/2025 | COT - RSEL - Electrical Underground | Passed | Passed 3/5/25 Ok to pour concrete | |
| 03/05/2025 | COT - RSEL - Grounding/Bonding | Passed | Passed 3/5/25 Ok to pour concrete | |
| 03/05/2025 | COT - RSPL - Yard Water Line | Passed | Passed 3/5/25 | |
| 04/09/2025 | COT - RSBU - Roof Nailing | Passed | 4-9-25, roof nailing approved-okay to dry in roof. | |
| 04/14/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 4/14/25 pass |
|
| 05/19/2025 | BULD - Electrical Clearance | Passed | 5/19/25 TEP CLEARANCE:ECO |
|
| 05/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 5-29-25, corrections made. Intermediate inspection approved. | |
| 06/13/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 09/08/2025 | COT - RSEL - Outdoor Lighting | Passed | 9.8.25 APPROVED |
|
| 09/08/2025 | COT - RSEL - Electrical Final | Passed | 9.8.25 APPROVED |
|
| 09/08/2025 | COT - RSME - Mechanical Final | Passed | 9.8.25 APPROVED |
|
| 09/08/2025 | COT - RSPL - Plumbing Final | Passed | 9.8.25 APPROVED |
|
| 09/08/2025 | ENGR Engineering Final | Passed | Site is complete in accordance with approved plans. | |
| 09/08/2025 | RSBU - Building Final | Passed | 9.8.25 APPROVED |
|
| 09/08/2025 | RSBU - Building Progress | Passed | 9.8.25 APPROVED |