Permit: TC-MDP-0924-01077
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
6776 E VIA DEL CANTILLO
Address NEW:
6776 E VIA DEL CANTILLO
Apply Date:
10/25/2024
Applicant:
Dana Petty
Description:
Single Family Residence plan 130.1460
Permit Reviews
Permit Number - TC-MDP-0924-01077
Permit Status: Complete
Permit Description: Single Family Residence plan 130.1460
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 05/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 05/09/2025 | APPROVED |
| 10/28/2024 | SITE FROM MODEL PERMIT - SUBDIVISION v.1 | 11/14/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01077
Permit Status: Complete
Permit Description: Single Family Residence plan 130.1460
| Date | Description | Comments |
|---|---|---|
| 09/20/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 09/20/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/29/2024 | Post-Tension Inspection Report is required. | |
| 09/20/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/20/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/29/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01077
Permite Description: Single Family Residence plan 130.1460
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 06/18/2025 | COT - RSEL - Electrical Final | N/A | Re-inspection required | Romex hanging outside back patio. Missing dishwasher. Label on panel. Non metallic plumbing. Cut clean outs to grade. Kitchen hood not installed along with range. 6/18/2025 |
| 06/18/2025 | COT - RSEL - Outdoor Lighting | N/A | Re-inspection required | Romex hanging outside back patio. Missing dishwasher. Label on panel. Non metallic plumbing. Cut clean outs to grade. Kitchen hood not installed along with range. 6/18/2025 |
| 06/18/2025 | COT - RSME - Mechanical Final | N/A | Re-inspection required | Romex hanging outside back patio. Missing dishwasher. Label on panel. Non metallic plumbing. Cut clean outs to grade. Kitchen hood not installed along with range. 6/18/2025 |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01077
Permit Description: Single Family Residence plan 130.1460
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/18/2025 | COT - RSPL - Yard Water Line | Passed | Passed 3/18/25 ok to backfill | |
| 03/18/2025 | COT - RSPL - Sewer | Passed | Passed 3/18/25 ok to backfill | |
| 03/18/2025 | COT - RSPL - Rough Soil | Passed | Passed 3/18/25 ok to backfill | |
| 03/24/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Passed 3/24/25 ok to pour concrete | |
| 03/24/2025 | COT - RSBU - Preslab | Passed | Passed 3/24/25 ok to pour concrete | |
| 03/24/2025 | COT - RSEL - Electrical Underground | Passed | Passed 3/24/25 ok to pour concrete | |
| 04/08/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 04/08/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 04/18/2025 | BULD - Electrical Clearance | Passed | 4/18/25 TEP CLEARANCE: ECO |
|
| 04/18/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 04/18/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 04/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4-22-25, intermediates approved. Okay to continue with construction. | |
| 05/07/2025 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 06/11/2025 | COT - BULD - SWG Clearance | Passed | 6-11-25: approved for SWG to install meter. Clearance issued. | |
| 06/18/2025 | RSBU - Building Progress | Passed | ||
| 06/20/2025 | COT - RSEL - Electrical Final | Passed | Approved. Corrections were made. 6/20/2025. | |
| 06/20/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/20/2025 | COT - RSME - Mechanical Final | Passed | Approved. Corrections were made. 6/20/2025. | |
| 06/20/2025 | COT - RSPL - Plumbing Final | Passed | ||
| 06/20/2025 | ENGR Engineering Final | Passed | Site is clean and safe, in accordance with approved plans. CofO ready. | |
| 06/20/2025 | RSBU - Building Final | Passed |