Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 4/18/25 1. Single gang box overloaded in kitchen just above refrigerator water line. Marked with an "O" on the stud. 2. First bedroom on the left, corner wall joint has blue romex running outside studs, marked with 2 red arrows. 3. Thermostat wire is too high. 4. Exhaust duct in master bath needs to be sealed 5. Top plate wall separating kitchen garage needs to be sealed, I labeled stud in red "seal". |
|
| 04/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4-22-25, intermediates approved. Okay to continue with construction. |