Permit Details

Status:
Complete
Type:
Model Building Permit
Apply Date:
10/25/2024
Applicant:
Dana Petty
Description:
Single Family Residence Plan 230.2380

Permit Reviews

Permit Number - TC-MDP-0924-01070
Permit Status: Complete
Permit Description: Single Family Residence Plan 230.2380
Start Date Submittal Complete Date Status  
10/28/2024 SITE FROM MODEL PERMIT - SUBDIVISION v.1 11/14/2024 APPROVED Review Details
04/25/2025 BUILDING DEFERRED SUBMITTAL REVIEW v.1 04/28/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01070
Permit Status: Complete
Permit Description: Single Family Residence Plan 230.2380
Date Description Comments
09/20/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
09/20/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
10/29/2024 Post-Tension Inspection Report is required.
09/20/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/20/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
10/29/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01070
Permite Description: Single Family Residence Plan 230.2380
Total Outstanding Inspections - 1
Last Inspection Date Description Inspector Results Comments
03/20/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 3-20-25, partial for ufer only.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01070
Permit Description: Single Family Residence Plan 230.2380
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/12/2025 COT - RSPL - Rough Soil Passed Passed 3/12/25 ok to backfill
03/12/2025 COT - RSPL - Sewer Passed Passed 3/12/25 ok to backfill
03/12/2025 COT - RSPL - Yard Water Line Passed Passed 3/12/25 ok to backfill
03/20/2025 COT - RSBU - Excavation/Rebar/Zoning Passed 3-20-25, reinforcement per plans-. okay to pour concrete
03/20/2025 COT - RSBU - Preslab Passed 3-20-25, preslab/reinforcement per plans-. okay to pour concrete
03/20/2025 COT - RSEL - Electrical Underground Passed 3-20-25, electrical underground
04/08/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/18/2025 COT - RSBU - Roof Nailing Passed
04/18/2025 BULD - Electrical Clearance Passed 4/18/25
TEP CLEARANCE: ECO
04/18/2025 COT - RSPL - Gas Pressure Test Passed
04/18/2025 COT - RSEL - Grounding/Bonding Passed
04/22/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4-22-25, intermediates approved. Okay to continue with construction.
05/05/2025 COT - RSBU - Interior Shear Bracing Passed
06/09/2025 COT - BULD - SWG Clearance Passed 6-9-25: okay for SWG to install meter. Clearance issued.
06/17/2025 COT - RSEL - Electrical Final Passed 6.17.25 final inspection approved as per plan and standards.
06/17/2025 COT - RSEL - Outdoor Lighting Passed 6.17.25 final inspection approved as per plan and standards.
06/17/2025 COT - RSME - Mechanical Final Passed 6.17.25 final inspection approved as per plan and standards.
06/17/2025 COT - RSPL - Plumbing Final Passed 6.17.25 final inspection approved as per plan and standards.
06/17/2025 ENGR Engineering Final Passed Back yard gate needs to be installed.
06/17/2025 RSBU - Building Final Passed 6.17.25 final inspection approved as per plan and standards.
06/17/2025 RSBU - Building Progress Passed 6.17.25 final inspection approved as per plan and standards.

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL.PDF DOCUMENTS VIEW
154143 PT LOT 88 COMPLETE-2025-04-24_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
LOT 88 PLOT PLAN_V1.PDF DOCUMENTS VIEW
LOT 88 SPECIAL INSPECTION CERTIFICATE-2024-10-25_V1.PDF DOCUMENTS VIEW