Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Inspection Status: Re-inspection required

Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.

Date Description Inspector Results Comments
04/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Re-inspection required 18 April 25
1. Top plate garage has 6 penetrations that need to be sealed.
2. Single gang box overloaded just left of refrigerant outlet, it's marked with an "O" on the stud.
3. Four gang box needs support in kitchen wall.
4. T-stat too high.
******STOPPED INSPECTION***** more items may be added.
04/22/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 4-22-25, intermediates approved. Okay to continue with construction.