Inspection History Details
Inspection Status: Re-inspection required
Inspection History: COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in.
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/18/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Re-inspection required | 18 April 25 1. Top plate garage has 6 penetrations that need to be sealed. 2. Single gang box overloaded just left of refrigerant outlet, it's marked with an "O" on the stud. 3. Four gang box needs support in kitchen wall. 4. T-stat too high. ******STOPPED INSPECTION***** more items may be added. |
|
| 04/22/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4-22-25, intermediates approved. Okay to continue with construction. |