Permit: TC-MDP-0924-01053
Permit Details
Apply Date:
09/12/2024
Applicant:
Ana Chavez
Description:
duplex model plan
Permit Reviews
Permit Number - TC-MDP-0924-01053
Permit Status: Complete
Permit Description: duplex model plan
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 11/07/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 12/05/2024 | REQUIRES RESUBMIT |
| 12/16/2024 | RESTAMP - RESIDENTIAL v.1 | 12/19/2024 | APPROVED |
| 09/24/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 10/08/2024 | REQUIRES RESUBMIT |
| 12/12/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 12/16/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01053
Permit Status: Complete
Permit Description: duplex model plan
| Date | Description | Comments |
|---|---|---|
| 12/12/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 09/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01053
Permite Description: duplex model plan
Total Outstanding Inspections - 3
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/05/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | N/A | Partial Pass | 2/5/25 fire foam needed at sill plates, vapor barrier penetrations must be sealed. Blocking at HVAC register must have blocking on 3 sides. Partial pass/. |
| 03/18/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
| 03/18/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01053
Permit Description: duplex model plan
Total Completed Inspections - 19