Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0924-01043
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
10414 E SILVER FOX DR
Address NEW:
10414 E SILVER FOX DR
Apply Date:
10/03/2024
Applicant:
Dana Petty
Description:
SFR MER1402370 T21-M0077 REV1 roof covering change
Permit Reviews
Permit Number - TC-MDP-0924-01043
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 03/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 03/28/2025 | APPROVED |
| 10/03/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/07/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01043
Permit Status: Complete
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
| Date | Description | Comments |
|---|---|---|
| 10/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/07/2024 | Post-Tension Inspection Report is required. | |
| 09/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01043
Permit Description: SFR MER1402370 T21-M0077 REV1 roof covering change
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/03/2025 | COT - RSPL - Rough Soil | Passed | Underground plumbing is complete and connected to main sewer line. Entire system is under a water pressure test with no leaks. Okay to shade all pipes and backfill all trenches. | |
| 02/03/2025 | COT - RSPL - Sewer | Passed | Underground plumbing is complete and connected to main sewer line. Entire system is under a water pressure test with no leaks. Okay to shade all pipes and backfill all trenches. | |
| 02/03/2025 | COT - RSPL - Yard Water Line | Passed | Main water supply line is connected to the meter and under street pressure. | |
| 02/07/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set in place, masa clips, A8,A11, and A14 Simpson shear wall ties are nailed to the form per plan requirements. Post tension cabling is evenly spaced and supported up off of ground. Ufer ground is installed on right side of garage. Underground electrical is installed for kitchen island. Underground plumbing is properly wrapped with foam. Okay to pour concrete for footings and slab. | |
| 02/07/2025 | COT - RSBU - Preslab | Passed | Concrete forms are set in place, masa clips, A8,A11, and A14 Simpson shear wall ties are nailed to the form per plan requirements. Post tension cabling is evenly spaced and supported up off of ground. Ufer ground is installed on right side of garage. Underground electrical is installed for kitchen island. Underground plumbing is properly wrapped with foam. Okay to pour concrete for footings and slab. | |
| 02/07/2025 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set in place, masa clips, A8,A11, and A14 Simpson shear wall ties are nailed to the form per plan requirements. Post tension cabling is evenly spaced and supported up off of ground. Ufer ground is installed on right side of garage. Underground electrical is installed for kitchen island. Underground plumbing is properly wrapped with foam. Okay to pour concrete for footings and slab. | |
| 02/19/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 02/19/2025 | COT - RSBU - Roof Nailing | Passed | Okay to dry-in roof and begin rough-in of mechanical, electrical, and plumbing. | |
| 03/12/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 03/12/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 12 March 25 Pass |
|
| 03/12/2025 | BULD - Electrical Clearance | Passed | 12 March 25 TEP CLEARANCE: ECO |
|
| 03/12/2025 | COT - RSPL - Gas Pressure Test | Passed | ||
| 03/21/2025 | COT - RSBU - Interior Shear Bracing | Passed | 3-21-25, interior shear wall inspection approved. Okay for tape & texture | |
| 05/09/2025 | COT - BULD - SWG Clearance | Passed | Passed CLEARANCE SWG 5/9/25 | |
| 05/16/2025 | COT - RSEL - Electrical Final | Passed | Passed 5/16/25 | |
| 05/16/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 5/16/25 | |
| 05/16/2025 | COT - RSME - Mechanical Final | Passed | Passed 5/16/25 | |
| 05/16/2025 | COT - RSPL - Plumbing Final | Passed | Passed 5/16/25 | |
| 05/16/2025 | RSBU - Building Final | Passed | Passed 5/16/25 | |
| 05/16/2025 | RSBU - Building Progress | Passed | Passed 5/16/25 | |
| 05/21/2025 | ENGR Engineering Final | Passed |