Permit: TC-MDP-0924-01039
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
296 N SUNNY COVE PL
Address NEW:
296 N SUNNY COVE PL
Apply Date:
10/03/2024
Applicant:
Dana Petty
Description:
SFR MER1402190 T21-M0078
Permit Reviews
Permit Number - TC-MDP-0924-01039
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 10/03/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 10/07/2024 | APPROVED |
| 01/31/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 02/03/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0924-01039
Permit Status: Complete
Permit Description: SFR MER1402190 T21-M0078
| Date | Description | Comments |
|---|---|---|
| 10/07/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 10/07/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. | |
| 10/07/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. | |
| 10/07/2024 | Post-Tension Inspection Report is required. | |
| 09/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 09/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 10/07/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01039
Permite Description: SFR MER1402190 T21-M0078
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 01/10/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Re-inspection required | 01/10/25 Damaged 2x4 on the north wall in kitchen. |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0924-01039
Permit Description: SFR MER1402190 T21-M0078
Total Completed Inspections - 22
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/12/2024 | COT - RSPL - Backwater Valve | Passed | 12-12-24, backwater valve, sewer connection, underground plumbing verified as per approved plans. Okay to backfill with shading materials. | |
| 12/12/2024 | COT - RSPL - Rough Soil | Passed | 12-12-24, backwater valve, sewer connection, underground plumbing verified as per approved plans. Okay to backfill with shading materials. | |
| 12/12/2024 | COT - RSPL - Sewer | Passed | 12-12-24, backwater valve, sewer connection, underground plumbing verified as per approved plans. Okay to backfill with shading materials. | |
| 12/12/2024 | COT - RSPL - Yard Water Line | Passed | 12-12-24, backwater valve, sewer connection, main water line, underground plumbing verified as per approved plans. Okay to backfill with shading materials. | |
| 12/19/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12-19-24, setbacks verified as per plans.Okay to pour concrete | |
| 12/19/2024 | COT - RSBU - Preslab | Passed | 12-19-24, preslab approved. Okay to pour concrete | |
| 12/19/2024 | COT - RSEL - Electrical Underground | Passed | 12-19-24, approved | |
| 01/10/2025 | COT - RSBU - Roof Nailing | Passed | 01/10/25 Passed. |
|
| 01/13/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 1/13/25: Damage 2x4 in kitchen has been replaced. All bolts, hold downs, and interior wall shot pins are installed throughout. Okay to proceed with rough in of plumbing, electrical, and mechanical. | |
| 02/05/2025 | COT - RSEL - Grounding/Bonding | Passed | 2-5-25, grounding/bonding approved plans. | |
| 02/05/2025 | BULD - Electrical Clearance | Passed | 2-5-25, panel okay to be energized. ECO clearance issued to TEP. | |
| 02/05/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 2-5-25, residential intermediate inspection approved plans. Okay to continue with construction. | |
| 02/05/2025 | COT - RSPL - Gas Pressure Test | Passed | 2-5-25, gas pressure test approved. | |
| 02/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | Drywall for interior shear drywall is properly secured to studs with screws per the plan requirements. Okay to proceed with tape, texture, and paint. | |
| 03/26/2025 | COT - BULD - SWG Clearance | Passed | Passed 3/26/25 CLEARANCE SWG | |
| 04/17/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/17/25 | |
| 04/17/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed final 4/17/25 | |
| 04/17/2025 | COT - RSME - Mechanical Final | Passed | Passed final 4/17/25 | |
| 04/17/2025 | COT - RSPL - Plumbing Final | Passed | Passed final 4/17/25 | |
| 04/17/2025 | RSBU - Building Final | Passed | Passed final 4/17/25 | |
| 04/17/2025 | RSBU - Building Progress | Passed | Passed final 4/17/25 | |
| 04/22/2025 | ENGR Engineering Final | Passed |