Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you cannot find what you are looking for please submit a records request.

Permit Details

Status:
Complete
Type:
Model Building Permit
Address NEW:
1605 N YAVAPAI ST
Apply Date:
09/05/2024
Applicant:
GGV Designs
Description:
SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE PREVIOUSLY APPROVED MODEL T20-00004 - REV_1

Permit Reviews

Permit Number - TC-MDP-0924-01027
Permit Status: Complete
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE PREVIOUSLY APPROVED MODEL T20-00004 - REV_1
Start Date Submittal Complete Date Status  
07/14/2025 SITE FROM MODEL TEMPLATE INFILL BUILDERS REVISION v.1 07/29/2025 APPROVED Review Details
02/06/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 02/24/2025 REQUIRES RESUBMIT Review Details
01/22/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 02/05/2025 REQUIRES RESUBMIT Review Details
02/27/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 03/21/2025 APPROVED Review Details
03/21/2025 RESTAMP - RESIDENTIAL v.1 03/27/2025 APPROVED Review Details

Conditions

Permit Number - TC-MDP-0924-01027
Permit Status: Complete
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE PREVIOUSLY APPROVED MODEL T20-00004 - REV_1
Date Description Comments
01/22/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
09/17/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
03/25/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01027
Permite Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE PREVIOUSLY APPROVED MODEL T20-00004 - REV_1
Total Outstanding Inspections - 6
Last Inspection Date Description Inspector Results Comments
07/09/2025 COT - RSBU - Interior Shear Bracing N/A Not Applicable
07/15/2025 BULD - Electrical Clearance N/A Not Ready Need addresses on electric panels in order for TEP to grant service.
09/26/2025 COT - RSPL - Yard Water Line N/A Not Ready
01/09/2026 COT - RSEL - Electrical Underground N/A Not Applicable
06/03/2025 COT - RSEL - Grounding/Bonding N/A Partial Pass 6.3.25 partial pass ufer only
01/09/2026 ENGR Engineering Final N/A Not Ready Site is not ready, ground cover needs to be complete and construction equipment needs to be off-site.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0924-01027
Permit Description: SWDUPLEXM SUNSET MODEL DUPLEX 3-2 TRUSS REVIEW COMPLETE PREVIOUSLY APPROVED MODEL T20-00004 - REV_1
Total Completed Inspections - 17
Date Description Inspector Results Comments
05/29/2025 COT - RSPL - Rough Soil Passed Okay to backfill. Shading required. 5/29/2025
06/03/2025 COT - RSBU - Preslab Passed 6.3.25 reinforcement and footing depth per plan. Good to pour.
07/09/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
07/09/2025 COT - RSBU - Roof Nailing Passed
07/17/2025 BULD - Electrical Clearance Passed 7.17.26
No unused openings. Neutrals verified. rise secured at two points. Brace kit in place. Grounding verified. Labels present. INCR CLEARANCE TO TEP
07/21/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
07/29/2025 COT - RSBU - Firewall/Fire Barrier/Firestop Passed
07/29/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
09/26/2025 COT - RSPL - Sewer Passed Passed 9/26/25 ok to backfill
10/02/2025 COT - RSPL - Yard Water Line Passed
01/09/2026 COT - RSEL - Electrical Final Passed
01/09/2026 COT - RSEL - Grounding/Bonding Passed
01/09/2026 COT - RSEL - Outdoor Lighting Passed
01/09/2026 COT - RSME - Mechanical Final Passed
01/09/2026 COT - RSPL - Plumbing Final Passed
01/09/2026 RSBU - Building Final Passed
01/13/2026 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFO_FINALCOFO_RESIDENTIAL (SSRS).PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
4_2024.68_1605 SW LOT C_REVISION LETTER_V1.PDF DOCUMENTS VIEW
CONS-4_PLAN_2024.68_1605 SW LOT C_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
3_2024.68_1605 SW LOT C_V3.PDF DOCUMENTS VIEW