Inspection History Details
Inspection Status: Not Ready
Inspection History: BULD - Electrical Clearance
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 07/15/2025 | BULD - Electrical Clearance | Not Ready | Need addresses on electric panels in order for TEP to grant service. | |
| 07/16/2025 | BULD - Electrical Clearance | Not Ready | Address must be posted on electric panel in order to receive service. | |
| 07/17/2025 | BULD - Electrical Clearance | Passed | 7.17.26 No unused openings. Neutrals verified. rise secured at two points. Brace kit in place. Grounding verified. Labels present. INCR CLEARANCE TO TEP |