Permit: TC-MDP-0825-00445
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
1317 W SPEEDWAY BL UNIT 1
Address NEW:
1317 W SPEEDWAY BL UNIT 1
Apply Date:
10/31/2025
Applicant:
Brandon Matheson
Description:
Residential SFR Model Plan (Model master plan TC-MDP-0325-00178)
Permit Reviews
Permit Number - TC-MDP-0825-00445
Permit Status: Complete
Permit Description: Residential SFR Model Plan (Model master plan TC-MDP-0325-00178)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 01/29/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/29/2026 | APPROVED |
| 01/13/2026 | ADMINISTRATIVE v.1 | 01/13/2026 | REQUIRES RESUBMIT |
| 10/31/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 11/13/2025 | REQUIRES RESUBMIT |
| 01/02/2026 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 01/13/2026 | APPROVED |
| 06/02/2026 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/02/2026 | APPROVED |
| 01/15/2026 | ADMINISTRATIVE v.2 | 01/15/2026 | REQUIRES RESUBMIT |
| 01/23/2026 | ADMINISTRATIVE v.3 | 01/23/2026 | APPROVED |
Conditions
Permit Number - TC-MDP-0825-00445
Permit Status: Complete
Permit Description: Residential SFR Model Plan (Model master plan TC-MDP-0325-00178)
| Date | Description | Comments |
|---|---|---|
| 01/12/2026 | Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections. | |
| 08/15/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/15/2025 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/15/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 01/12/2026 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0825-00445
Permite Description: Residential SFR Model Plan (Model master plan TC-MDP-0325-00178)
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 03/11/2026 | COT - RSBU - Interior Shear Bracing | N/A | Partial Pass | 3.11.26 Approved for first layer of firewall partial pass |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0825-00445
Permit Description: Residential SFR Model Plan (Model master plan TC-MDP-0325-00178)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/18/2026 | COT - RSPL - Rough Soil | Passed | ||
| 02/25/2026 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 02/25/2026 | COT - RSBU - Preslab | Passed | ||
| 03/11/2026 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 3.11.26 Approved, proceed |
|
| 03/11/2026 | COT - RSEL - Grounding/Bonding | Passed | ||
| 03/20/2026 | COT - RSBU - Roof Nailing | Passed | Approved per Anthony C. 3/20/2026 | |
| 04/01/2026 | COT - RSBU - Interior Shear Bracing | Passed | ||
| 04/01/2026 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | 4/1/26 Pass |
|
| 04/01/2026 | COT - RSEL - Electrical Underground | Passed | ||
| 04/01/2026 | COT - RSPL - Yard Water Line | Passed | ||
| 04/24/2026 | BULD - Electrical Clearance | Passed | Clearance for TEP ECO. UNIT#1 4/24/2026 | |
| 05/11/2026 | COT - RSPL - Sewer | Passed | 05/11/2026 Holding under test to HCS with green tracer wire. Okay to backfill, shading required. |
|
| 05/29/2026 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/01/2026 | COT - RSEL - Electrical Final | Passed | 06/01/2026 Verified breaker sized according to manufacturer's specs. Added label to main panel to spare breaker. |
|
| 06/01/2026 | COT - RSME - Mechanical Final | Passed | 06/01/2026 Verified added insulation to tankless water heater. |
|
| 06/01/2026 | COT - RSPL - Plumbing Final | Passed | ||
| 06/01/2026 | ENGR Engineering Final | Passed | 6/1/26 - Site is complete in accordance with approved plans. | |
| 06/01/2026 | RSBU - Building Final | Passed |