Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Address NEW:
714 W CALLE ADELANTO
Apply Date:
08/15/2025
Applicant:
Ramon VALDEZ
Description:
Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)

Permit Reviews

Permit Number - TC-MDP-0825-00443
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Start Date Submittal Complete Date Status  
09/12/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 10/02/2025 APPROVED Review Details
10/02/2025 ADMINISTRATIVE v.1 10/02/2025 REQUIRES RESUBMIT Review Details
10/03/2025 ADMINISTRATIVE v.2 10/03/2025 APPROVED Review Details
08/18/2025 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/05/2025 REQUIRES RESUBMIT Review Details
10/02/2025 RESTAMP - RESIDENTIAL v.1 10/02/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0825-00443
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Activity Conditions - 2
Date Name
08/15/2025 Submit the Air Leakage & Duct Tightness Test Report completed by an Approved Special Inspector prior to Final Inspections.
08/15/2025 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0825-00443
Permit Status: Inspections complete
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Date Description Comments
08/15/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit is required prior to issuance of permit. The Affidavit form is available at https://www.tucsonaz.gov/Departments/Planning-Development-Services/Permits/Residential-Permits. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
08/15/2025 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
09/02/2025 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0825-00443
Permite Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Outstanding Inspections - 4
Last Inspection Date Description Inspector Results Comments
12/15/2025 COT - BULD - SWG Clearance N/A Not Applicable
12/15/2025 COT - RSBU - Interior Shear Bracing N/A Not Applicable
12/15/2025 COT - RSEL - Electrical Underground N/A Not Applicable
12/15/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0825-00443
Permit Description: Duplex SFR & ADU (Model master plan TC-MDP-1224-01416)
Total Completed Inspections - 17
Date Description Inspector Results Comments
10/10/2025 COT - RSPL - Sewer Passed
10/10/2025 COT - RSPL - Rough Soil Passed
10/14/2025 COT - RSBU - Excavation/Rebar/Zoning Passed
10/14/2025 COT - RSBU - Preslab Passed
10/20/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
10/20/2025 COT - RSBU - Roof Nailing Passed
10/22/2025 BULD - Electrical Clearance Passed Ensure addresses are correct on electric panels. Code: ECO
10/22/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Ok to insulate and sheet rock throughout
10/22/2025 COT - RSEL - Grounding/Bonding Passed
12/15/2025 COT - RSEL - Electrical Final Passed
12/15/2025 COT - RSEL - Outdoor Lighting Passed
12/15/2025 COT - RSME - Mechanical Final Passed
12/15/2025 COT - RSPL - Plumbing Final Passed
12/15/2025 COT - RSPL - Yard Water Line Passed
12/15/2025 ENGR Engineering Final Passed Site is complete in accordance with approved plans.
12/15/2025 RSBU - Building Final Passed
12/15/2025 RSBU - Building Progress Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
714 ADELANTO (1)_V2.PDF DOCUMENTS VIEW
ADELANTO FULL_V2.PDF DOCUMENTS VIEW
TC-MDP-0825-00443 LETTER_V1.PDF DOCUMENTS VIEW