Permit: TC-MDP-0824-00981
Permit Details
Apply Date:
09/15/2024
Applicant:
Joshua Swinney
Description:
SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8
Permit Reviews
Permit Number - TC-MDP-0824-00981
Permit Status: Inspections
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
09/19/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/25/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0824-00981
Permit Status: Inspections
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8
Total Outstanding Activity Conditions - 6
Date | Name |
---|---|
08/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
08/30/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
09/24/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
09/24/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
09/24/2024 | Post-Tension Inspection Report is required. |
09/24/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0824-00981
Permit Status: Inspections
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8
Date | Description | Comments |
---|---|---|
08/30/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
08/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0824-00981
Permite Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8
Total Outstanding Inspections - 2
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/22/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
10/22/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable |
Completed Inspections
Permit Status: Inspections
Permit Number: TC-MDP-0824-00981
Permit Description: SFR 470 Great Sand Dunes Model Plan La Estancia Blocks 6, 7, 8
Total Completed Inspections - 9
Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
10/22/2024 | COT - RSPL - Yard Water Line | Passed | 10/22/24: plumbing underground per plans ok to backfill. Shading required. | |
10/22/2024 | COT - RSPL - Rough Soil | Passed | 10/22/24: plumbing underground per plans ok to backfill. Shading required. | |
10/22/2024 | COT - RSPL - Sewer | Passed | 10/22/24: plumbing underground per plans ok to backfill. Shading required. | |
10/22/2024 | COT - RSEL - Electrical Underground | Passed | ||
11/04/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 11-4-24 setbacks per approved plans. Okay to pour concrete. | |
11/04/2024 | COT - RSBU - Preslab | Passed | 11-4-24, preslab per approved plans. Okay to pour concrete. | |
11/04/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-4-24 grounding/bonding per approved plans. Okay to pour concrete. | |
12/12/2024 | COT - RSBU - Exterior Clips/Sheathing | Passed | 12/12/24 corrections made | |
12/12/2024 | COT - RSBU - Roof Nailing | Passed | 12/12/24 corrections made |