Permit: TC-MDP-0824-00980
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
905 S KROEGER LN UNIT 2
Address NEW:
905 S KROEGER LN UNIT 2
Apply Date:
09/02/2024
Applicant:
Gustavo Silva
Description:
Detached Sonoran ADU
Permit Reviews
Permit Number - TC-MDP-0824-00980
Permit Status: Complete
Permit Description: Detached Sonoran ADU
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 09/12/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 09/26/2024 | REQUIRES RESUBMIT |
| 09/27/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 10/09/2024 | REQUIRES RESUBMIT |
| 10/31/2024 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.3 | 11/18/2024 | APPROVED |
| 11/18/2024 | RESTAMP - RESIDENTIAL v.1 | 11/20/2024 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00980
Permit Status: Complete
Permit Description: Detached Sonoran ADU
| Date | Description | Comments |
|---|---|---|
| 11/25/2024 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/29/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00980
Permite Description: Detached Sonoran ADU
Total Outstanding Inspections - 5
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 02/21/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | N/A | Not Applicable | Not applicable had pregrout inspection |
| 03/12/2025 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | No gas service to structure. |
| 08/07/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | 8-7-25: not applicable |
| 08/07/2025 | COT - BULD - SWG Clearance | N/A | Not Applicable | 8-7-25: not applicable |
| 08/07/2025 | BULD - Electrical Clearance | N/A | Not Applicable | 8-7-25: not applicable |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00980
Permit Description: Detached Sonoran ADU
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 12/24/2024 | COT - RSEL - Electrical Underground | Passed | 12/24/24 pass | |
| 12/24/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12/24/24 pass | |
| 12/24/2024 | COT - RSBU - Preslab | Passed | 12/24/24 pass | |
| 12/31/2024 | COT - RSPL - Rough Soil | Passed | ||
| 01/14/2025 | COT - RSBU - Masonry Pregrout | Passed | 1/14/25 pass ok to proceed. | |
| 02/21/2025 | COT - RSBU - Roof Nailing | Passed | Passed 2/21/25 | |
| 02/21/2025 | COT - RSPL - Yard Water Line | Passed | Passed 2/21/25 ok to backfill | |
| 03/12/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate bathroom and bedroom walls and cover | |
| 03/24/2025 | COT - RSPL - Sewer | Passed | 24 March 25 Pass, ok to backfill, shading required. |
|
| 08/07/2025 | COT - RSEL - Grounding/Bonding | Passed | 8-7-25: approved | |
| 08/07/2025 | COT - RSEL - Outdoor Lighting | Passed | 8-7-25; approved | |
| 08/07/2025 | COT - RSPL - Plumbing Final | Passed | 8-7-25: approved. | |
| 08/08/2025 | RSBU - Building Progress | Passed | ||
| 08/08/2025 | COT - RSEL - Electrical Final | Passed | 8.8.2025 Corrections made. |
|
| 08/08/2025 | COT - RSME - Mechanical Final | Passed | ||
| 08/08/2025 | RSBU - Building Final | Passed | 8.8.2025 Corrections made. |
|
| 08/08/2025 | ENGR Engineering Final | Passed |