Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.
Permit: TC-MDP-0824-00926
Permit Details
Status:
Complete
Type:
Model Building Permit
Address:
9125 E CATALINA HY BLDG 163
Address NEW:
9125 E CATALINA HY BLDG 163
Apply Date:
09/16/2024
Applicant:
Cassidy Fenton
Description:
DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Permit Reviews
Permit Number - TC-MDP-0824-00926
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 06/25/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 06/26/2025 | REQUIRES RESUBMIT |
| 07/08/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 07/09/2025 | APPROVED |
| 09/23/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 09/30/2024 | APPROVED |
| 07/14/2025 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 07/14/2025 | APPROVED |
Conditions
Permit Number - TC-MDP-0824-00926
Permit Status: Complete
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
| Date | Description | Comments |
|---|---|---|
| 09/23/2024 | Please contact Pima County Addressing to resolve issue. Addressing@pima.gov or 520-724-9512 | |
| 09/24/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. | |
| 09/24/2024 | Post-Tension Inspection Report is required. | |
| 08/28/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/28/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ | |
| 09/24/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Outstanding Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00926
Permite Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Total Outstanding Inspections - 6
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2024 | RSBU - Building Progress | N/A | Not Applicable | |
| 12/02/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | NOT APPLICABLE--NO GAS ONSITE. |
| 12/02/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | NOT APPLICABLE--NO GAS ONSITE. |
| 06/05/2025 | COT - RSPL - Plumbing Final | N/A | Re-inspection required | 6/4/25 1. Laundry circuit is tied into bathroom. 2. HVAC Max Fuse is 25A, you have 50A breaker/Fuse. 3. All exterior plastic piping must be painted to prevent U.V. Damage. 4. Shower door needs to be Tempered, missing etching on glass to indicate this. |
| 06/05/2025 | RSBU - Building Final | N/A | Re-inspection required | 6/4/25 1. Laundry circuit is tied into bathroom. 2. HVAC Max Fuse is 25A, you have 50A breaker/Fuse. 3. All exterior plastic piping must be painted to prevent U.V. Damage. 4. Shower door needs to be Tempered, missing etching on glass to indicate this. |
| 10/18/2024 | ENGR Engineering Final | N/A | Not Ready | Contractor was looking for utility inspection |
Completed Inspections
Permit Status: Complete
Permit Number: TC-MDP-0824-00926
Permit Description: DUPLEX CASITA1X1 T20-M0044 (Model Template TC-MDP-0824-00852)
Total Completed Inspections - 18
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 11/20/2024 | COT - RSPL - Yard Water Line | Passed | ||
| 11/20/2024 | COT - RSPL - Sewer | Passed | ||
| 12/02/2024 | COT - RSPL - Rough Soil | Passed | ||
| 12/02/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | Concrete forms are set, post tension cabling is spaced evenly per plans, additional rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is installed for kitchen island, and Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 12/02/2024 | COT - RSBU - Preslab | Passed | Concrete forms are set, post tension cabling is spaced evenly per plans, additional rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is installed for kitchen island, and Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 12/02/2024 | COT - RSEL - Electrical Underground | Passed | Concrete forms are set, post tension cabling is spaced evenly per plans, additional rebar reinforcement is in place per plans, underground plumbing is properly wrapped with foam, underground electrical conduit is installed for kitchen island, and Ufer ground is in place. Okay to pour concrete for footings and slab. | |
| 01/03/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 01/03/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 02/24/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Passed 2/24/25 ok to drywall | |
| 03/14/2025 | COT - RSBU - Interior Shear Bracing | Passed | Passed final 3/14/25 | |
| 04/18/2025 | BULD - Electrical Clearance | Passed | Ready for temp power 4/18/25 CLEARANCE ECO | |
| 04/18/2025 | COT - RSEL - Grounding/Bonding | Passed | Ready for temp power 4/18/25 CLEARANCE ECO | |
| 06/04/2025 | COT - RSEL - Outdoor Lighting | Passed | ||
| 06/09/2025 | COT - RSEL - Electrical Final | Passed | passed final 6/9/25 | |
| 06/09/2025 | COT - RSME - Mechanical Final | Passed | passed final 6/9/25 | |
| 06/09/2025 | COT - RSPL - Plumbing Final | Passed | passed final 6/9/25 | |
| 06/09/2025 | RSBU - Building Final | Passed | passed final 6/9/25 | |
| 06/16/2025 | ENGR Engineering Final | Passed |