Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/23/2024
Applicant:
Andrea Flood
Description:
SFR RKK35G T21-M0090

Permit Reviews

Permit Number - TC-MDP-0824-00910
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Start Date Submittal Complete Date Status  
02/25/2025 SITE FROM MODEL PERMIT - PRODUCTION v.2 02/26/2025 APPROVED Review Details
02/11/2025 SITE FROM MODEL PERMIT - PRODUCTION v.1 02/20/2025 REQUIRES RESUBMIT Review Details
02/26/2025 RESTAMP - RESIDENTIAL v.1 03/06/2025 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0824-00910
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Total Outstanding Activity Conditions - 4
Date Name
02/11/2025 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
02/11/2025 Post-Installed Anchor Inspection Report is required.
02/11/2025 Post-Tension Inspection Report is required.
08/26/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/

Conditions

Permit Number - TC-MDP-0824-00910
Permit Status: Inspections complete
Permit Description: SFR RKK35G T21-M0090
Date Description Comments
02/11/2025 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
08/26/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00910
Permite Description: SFR RKK35G T21-M0090
Total Outstanding Inspections - 2
Last Inspection Date Description Inspector Results Comments
05/09/2025 BULD - Electrical Clearance N/A Re-inspection required Not ready. Missing temp receptacle along with breakers in panel. 5/9/2025
05/13/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. N/A Partial Pass According to the plans, we are shorts branch circuits. Lower t stat. Missing receptacle right side of SGD. bearing truss above kitchen hood has been damaged. 5/9/2025


5/13/25
1.Truss above hood will need repair and engineer letter.
2. I counted 19 circuits, panel schedule calls for 27. Jim with Austin electric spoke with Juan Garcia and this is approved.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00910
Permit Description: SFR RKK35G T21-M0090
Total Completed Inspections - 21
Date Description Inspector Results Comments
03/20/2025 COT - RSPL - Rough Soil Passed 3-20-25, underground plumbing approved. Okay to backfill-provide shading.
03/20/2025 COT - RSPL - Sewer Passed 3-20-25, main water line, sewer connection, and underground plumbing approved. Okay to backfill-provide shading.
03/20/2025 COT - RSPL - Yard Water Line Passed 3-20-25, main water line, sewer connection, and underground plumbing approved. Okay to backfill-provide shading.
04/02/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 4/2/25 ok to pour concrete
04/02/2025 COT - RSBU - Preslab Passed Passed 4/2/25 ok to pour concrete
04/02/2025 COT - RSEL - Electrical Underground Passed Passed 4/2/25 ok to pour concrete
04/23/2025 COT - RSBU - Roof Nailing Passed 4-23-25, roof nailing approved. Okay to dry-in roof & continue with construction.
04/24/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 4/24/25 corrections made
05/09/2025 COT - RSEL - Grounding/Bonding Passed
05/09/2025 COT - RSPL - Gas Pressure Test Passed
05/12/2025 BULD - Electrical Clearance Passed 05/12/25
TEP CLEARANCE:ECO
05/22/2025 COT - RSBU - Interior Shear Bracing Passed Passed 5/22/25 ok to tape
05/28/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 5-28-25, intermediates approved. Engineer fix to be submitted to the city for review.
07/03/2025 COT - BULD - SWG Clearance Passed Clearance for southwest gas. 7/3/2025
07/22/2025 COT - RSEL - Electrical Final Passed 7-22-25: electrical final approved.
07/22/2025 COT - RSEL - Outdoor Lighting Passed 7-22-25: outdoor lighting approved.
07/22/2025 COT - RSME - Mechanical Final Passed 7-22-25: mechanical final approved.
07/22/2025 COT - RSPL - Plumbing Final Passed 7-22-25: plumbing final approved.
07/22/2025 RSBU - Building Progress Passed
07/25/2025 RSBU - Building Final Passed
07/25/2025 ENGR Engineering Final Passed Sewer collars have been corrected. Everything else is in accordance with approved plans.

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
2_SITEPLAN_V2.PDF DOCUMENTS VIEW