Permit: TC-MDP-0824-00903
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
1139 W DISTRICT ST
Address NEW:
1139 W DISTRICT ST
Apply Date:
08/23/2024
Applicant:
Ramon VALDEZ
Description:
SFR VALD00122 T22-M0013
Permit Reviews
Permit Number - TC-MDP-0824-00903
Permit Status: Inspections complete
Permit Description: SFR VALD00122 T22-M0013
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 02/21/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 | 02/21/2025 | REQUIRES RESUBMIT |
| 02/24/2025 | SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 | 04/03/2025 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0824-00903
Permit Status: Inspections complete
Permit Description: SFR VALD00122 T22-M0013
Total Outstanding Activity Conditions - 1
| Date | Name |
|---|---|
| 03/13/2025 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
Conditions
Permit Number - TC-MDP-0824-00903
Permit Status: Inspections complete
Permit Description: SFR VALD00122 T22-M0013
| Date | Description | Comments |
|---|---|---|
| 02/21/2025 | Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit. | |
| 08/23/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. |
Outstanding Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00903
Permite Description: SFR VALD00122 T22-M0013
Total Outstanding Inspections - 1
| Last Inspection Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2025 | COT - RSBU - Interior Shear Bracing | N/A | Not Applicable | no interior shear walls |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00903
Permit Description: SFR VALD00122 T22-M0013
Total Completed Inspections - 17
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/30/2025 | COT - RSPL - Rough Soil | Passed | 4-30-25, underground plumbing approved. Okay to backfill-shading required. Note: greywater to be verified at intermediates |
|
| 05/05/2025 | COT - RSBU - Excavation/Rebar/Zoning | Passed | ||
| 05/05/2025 | COT - RSBU - Preslab | Passed | ||
| 05/27/2025 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | ||
| 05/27/2025 | COT - RSBU - Roof Nailing | Passed | ||
| 05/29/2025 | BULD - Electrical Clearance | Passed | Ok to set meter and begin new service. | |
| 05/29/2025 | COT - RSEL - Grounding/Bonding | Passed | ||
| 05/29/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Ok to insulate and sheet rock interior walls. | |
| 09/03/2025 | COT - RSPL - Sewer | Passed | 9.3.2025 Okay to backfill, shading required. |
|
| 09/26/2025 | COT - RSEL - Electrical Underground | Passed | ||
| 09/26/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 9/26/25 | |
| 09/26/2025 | COT - RSPL - Yard Water Line | Passed | Passed 9/26/25 | |
| 09/26/2025 | ENGR Engineering Final | Passed | Site is clean and accessible, complete in accordance with approved plans. | |
| 10/06/2025 | COT - RSEL - Electrical Final | Passed | 10.6.2025 Corrections made to 9.26.2025 inspection, added insulation at HW heater line. |
|
| 10/06/2025 | COT - RSME - Mechanical Final | Passed | 10.6.2025 Corrections made to 9.26.2025 inspection, added insulation at HW heater line. |
|
| 10/06/2025 | COT - RSPL - Plumbing Final | Passed | 10.6.2025 Corrections made to 9.26.2025 inspection, added insulation at HW heater line. |
|
| 10/06/2025 | RSBU - Building Final | Passed | 10.6.2025 Corrections made to 9.26.2025 inspection, added insulation at HW heater line. |