Inspection History Details
Inspection Status: Re-inspection required
Inspection History: RSBU - Building Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 09/26/2025 | RSBU - Building Final | Re-inspection required | Lock out breaker needed for water heater, must have cooking appliance and dishwasher installed for final. GFCI for garbage disposal not functioning. | |
| 10/06/2025 | RSBU - Building Final | Passed | 10.6.2025 Corrections made to 9.26.2025 inspection, added insulation at HW heater line. |