Permit Details

Status:
Complete
Type:
Model Building Permit
Address:
1339 E 8TH ST
Address NEW:
1339 E 8TH ST
Apply Date:
08/20/2024
Applicant:
Amanda Gattenby
Description:
New Detached Sleeping Quarters

Permit Reviews

Permit Number - TC-MDP-0824-00871
Permit Status: Complete
Permit Description: New Detached Sleeping Quarters
Start Date Submittal Complete Date Status  
10/04/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.2 10/17/2024 APPROVED Review Details
08/23/2024 SITE FROM MODEL TEMPLATE - INFILL BUILDERS v.1 09/11/2024 REQUIRES RESUBMIT Review Details

Conditions

Permit Number - TC-MDP-0824-00871
Permit Status: Complete
Permit Description: New Detached Sleeping Quarters
Date Description Comments
10/17/2024 Contractor with active Arizona Contractor's License for specified scope of work, or a signed Owner Builder Affidavit https://www.tucsonaz.gov/files/sharedassets/public/v/1/pdsd/documents/permits/residential-permits/pdsd_owner_builder_affidavit_081623.pdf, is required prior to issuance of permit. Contractor or Owner must have a TDC Online account and be added to the permit as the correct contact type https://www.tucsonaz.gov/files/sharedassets/public/v/2/pdsd/documents/tdc-faq/new-pdfs/adding-additional-contacts.pdf. If you are providing an Owner Builder Affidavit, the owner MUST be attached as a contact on the permit.
08/19/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.

Outstanding Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00871
Permite Description: New Detached Sleeping Quarters
Total Outstanding Inspections - 3
Last Inspection Date Description Inspector Results Comments
07/08/2025 COT - BULD - SWG Clearance N/A Not Applicable
07/08/2025 COT - RSPL - Gas Pressure Test N/A Not Applicable
08/07/2025 ENGR Engineering Final N/A Not Ready 8/7/25
Driveway/Apron not installed.
Inclusive Home Design Ordinance calls for an Accessible route to the public way.

I met contractor at site, and he asked me to put my points in the notes:

The plan was approved by the city. On sheet A001 the plan shows a Standard detail 206 driveway. It also shows an accessible route just to the west of the driveway, to the door of the ADU. There are also Inclusive Home Design Notes on sheet A002.

If the accessible route meets the doorway at grade it will comply.

TSM 7-01.3.3.C states that within the pedestrian circulation path, an accessible route is also required in compliance with the cities adopted building code. 7–01.4.3.C defines the composition of the sidewalk, making up the pedestrian circulation path, of which the accessible route is under.

There are also Inclusive Home Design Notes on sheet A002. If the accessible route meets the doorway at grade it will comply.

Composition:
1. Portland cement concrete, 4” thick, with a smooth or broom finish;
2. Brick pavers set in a bed of cement;
3. Resin Pavement Mixture that complies or is equivalent to ASTM D 4123


Submitting a revision for review is an option.

Completed Inspections

Permit Status: Complete
Permit Number: TC-MDP-0824-00871
Permit Description: New Detached Sleeping Quarters
Total Completed Inspections - 19
Date Description Inspector Results Comments
02/07/2025 COT - RSPL - Rough Soil Passed
02/07/2025 COT - RSPL - Sewer Passed
02/07/2025 COT - RSPL - Yard Water Line Passed
02/21/2025 COT - RSBU - Preslab Passed Passed 2/21/25 ok to pour concrete
02/21/2025 COT - RSBU - Excavation/Rebar/Zoning Passed Passed 2/21/25 ok to pour concrete
04/01/2025 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed
04/01/2025 COT - RSBU - Roof Nailing Passed Ok to dry-in roof system
04/18/2025 COT - RSBU - Interior Shear Bracing Passed
04/18/2025 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed
04/18/2025 COT - RSEL - Electrical Underground Passed
04/18/2025 COT - RSEL - Grounding/Bonding Passed
05/30/2025 BULD - Electrical Clearance Passed No electric clearance required for main house.
07/08/2025 COT - RSEL - Outdoor Lighting Passed
07/08/2025 RSBU - Building Progress Passed
08/06/2025 COT - RSEL - Electrical Final Passed 8.6.25
Acceptable corrections made as requested
Approved
08/06/2025 COT - RSME - Mechanical Final Passed 8.6.25
Acceptable corrections made as requested
Approved
08/06/2025 COT - RSPL - Plumbing Final Passed 8.6.25
Acceptable corrections made as requested
Approved
08/06/2025 RSBU - Building Final Passed 8.6.25
Acceptable corrections made as requested
Approved
10/02/2025 ENGR Engineering Final Passed

Documents

File Name Document Type  
LOFC.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1339E8TH_PLANSET_REV2_V2.PDF DOCUMENTS VIEW