Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
08/22/2024
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes

Permit Reviews

Permit Number - TC-MDP-0824-00868
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Start Date Submittal Complete Date Status  
08/23/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/30/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0824-00868
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
Date Name
08/19/2024 Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/
08/30/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
08/30/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
08/30/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
08/30/2024 Post-Tension Inspection Report is required.
08/30/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0824-00868
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Date Description Comments
08/19/2024 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900.
08/30/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00868
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 22
Date Description Inspector Results Comments
09/18/2024 COT - RSPL - Yard Water Line Passed
09/18/2024 COT - RSPL - Sewer Passed
09/18/2024 COT - RSPL - Rough Soil Passed
09/18/2024 COT - RSPL - Backwater Valve Passed
09/30/2024 COT - RSEL - Electrical Underground Passed Concrete forms are set, post tension cabling is evenly spaced, additional rebar reinforcement is in place per plan, Ufer ground is in place on side of garage, masa clips are evenly spaced at 32" on center, shear wall hold downs are placed per plan, all underground plumbing pipes are properly wrapped, and underground electrical outlets and conduit for kitchen island is installed. Okay to pour concrete.
09/30/2024 COT - RSBU - Preslab Passed Concrete forms are set, post tension cabling is evenly spaced, additional rebar reinforcement is in place per plan, Ufer ground is in place on side of garage, masa clips are evenly spaced at 32" on center, shear wall hold downs are placed per plan, all underground plumbing pipes are properly wrapped, and underground electrical outlets and conduit for kitchen island is installed. Okay to pour concrete.
09/30/2024 COT - RSBU - Excavation/Rebar/Zoning Passed Concrete forms are set, post tension cabling is evenly spaced, additional rebar reinforcement is in place per plan, Ufer ground is in place on side of garage, masa clips are evenly spaced at 32" on center, shear wall hold downs are placed per plan, all underground plumbing pipes are properly wrapped, and underground electrical outlets and conduit for kitchen island is installed. Okay to pour concrete.
11/01/2024 COT - RSBU - Roof Nailing Passed 11-1-24, roof nailing per approved plans. Okay to continue with construction.
11/01/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 11-1-24, exterior clip/sheathing per approved plans. Okay to continue with construction.
12/13/2024 COT - RSEL - Grounding/Bonding Passed pass
12/13/2024 BULD - Electrical Clearance Passed 12/13/24 TEP clearance code: ECO
12/13/2024 COT - RSPL - Gas Pressure Test Passed pass
12/16/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed 12-16-24, items from previous inspection have been corrected. Okay to proceed with construction.
01/13/2025 COT - RSBU - Interior Shear Bracing Passed Drywall shear walls are properly secured to the studs per plan requirements. Okay to proceed with tape, texture, and paint
03/17/2025 COT - BULD - SWG Clearance Passed 3-7-25, okay for SWG to install meter. Clearance
04/02/2025 COT - RSME - Mechanical Final Passed Passed 4/2/25
04/02/2025 COT - RSEL - Outdoor Lighting Passed Passed 4/2/25
04/02/2025 RSBU - Building Progress Passed Passed 4/2/25
04/02/2025 COT - RSEL - Electrical Final Passed Passed 4/2/25
04/04/2025 RSBU - Building Final Passed
04/04/2025 ENGR Engineering Final Passed
04/04/2025 COT - RSPL - Plumbing Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-08-22_V1.PDF DOCUMENTS VIEW