Permit: TC-MDP-0824-00867
Permit Details
Status:
Inspections Complete
Type:
Model Building Permit
Address:
12764 E TORTOISE POINTE DR
Address NEW:
12764 E TORTOISE POINTE DR
Apply Date:
08/20/2024
Applicant:
Description:
SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Permit Reviews
Permit Number - TC-MDP-0824-00867
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Start Date | Submittal | Complete Date | Status |
|---|---|---|---|
| 08/23/2024 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/30/2024 | APPROVED |
Outstanding Activity Conditions
Permit Number - TC-MDP-0824-00867
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Outstanding Activity Conditions - 6
| Date | Name |
|---|---|
| 08/19/2024 | Sewer condition must be accepted and released by Pima County prior to issuance of a Temporary Certificate of Occupancy. For More Information visit https://www.pima.gov/1076/Sewer-Connection-Permits, To check your permit status https://permits.pima.gov/ |
| 08/30/2024 | SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED. |
| 08/30/2024 | SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED. |
| 08/30/2024 | SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED. |
| 08/30/2024 | Post-Tension Inspection Report is required. |
| 08/30/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. |
Conditions
Permit Number - TC-MDP-0824-00867
Permit Status: Inspections complete
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
| Date | Description | Comments |
|---|---|---|
| 08/19/2024 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. For review and assessment: apply online at https://permits.pima.gov/ or contact us at sewer@pima.gov, (520) 724-9900. | |
| 08/30/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Completed Inspections
Permit Status: Inspections Complete
Permit Number: TC-MDP-0824-00867
Permit Description: SFR RKF55J T21-M0088 REVISION-Grade & Structural Changes
Total Completed Inspections - 21
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 10/23/2024 | COT - RSPL - Sewer | Passed | Sewer is connected to underground plumbing and under a water test. Okay to shade pipes and backfill trenches. | |
| 10/23/2024 | COT - RSPL - Yard Water Line | Passed | Connected to water meter and under street pressure. Okay to shade pipe and backfill trench. | |
| 10/23/2024 | COT - RSPL - Rough Soil | Passed | Sewer is connected to underground plumbing and under a water test. Okay to shade pipes and backfill trenches. | |
| 11/05/2024 | COT - RSBU - Preslab | Passed | 11-5-24, preslab per approved plans. Okay to pour concrete. | |
| 11/05/2024 | COT - RSEL - Electrical Underground | Passed | 11-5-24, grounding/bonding& electrical per approved plans. Okay to pour concrete. | |
| 11/05/2024 | COT - RSEL - Grounding/Bonding | Passed | 11-5-24, grounding/bonding per approved plans. Okay to pour concrete. | |
| 12/03/2024 | COT - RSBU - Excavation/Rebar/Zoning | Passed | 12-3-24, approved. | |
| 12/03/2024 | COT - RSBU - Exterior/Interior Clips/Sheathing/Framing | Passed | 12-3-24, note: nail down all h-25's at interior load bearing walls by intermediate inspection. Exterior clips/sheathing, truss bracing, and roof nailing verified as per approved plans. Okay to continue with construction. | |
| 12/03/2024 | COT - RSBU - Roof Nailing | Passed | 12-3-24, note: nail down all h-25's at interior load bearing walls by intermediate inspection. Exterior clips/sheathing, truss bracing, and roof nailing verified as per approved plans. Okay to continue with construction. | |
| 01/08/2025 | BULD - Electrical Clearance | Passed | Ready for temp power 1/8/24 | |
| 01/08/2025 | COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. | Passed | Corrections made on site, ok to proceed and drywall 1/8/25 | |
| 01/08/2025 | COT - RSPL - Gas Pressure Test | Passed | Holds pressure 1/8/25 | |
| 01/22/2025 | COT - RSBU - Interior Shear Bracing | Passed | 1/22/25 pass | |
| 03/20/2025 | COT - BULD - SWG Clearance | Passed | 3-20-25, okay for SWG to install meter. Clearance issued. | |
| 04/02/2025 | COT - RSEL - Electrical Final | Passed | Passed final 4/2/25 CLEARANCE ECO | |
| 04/02/2025 | COT - RSEL - Outdoor Lighting | Passed | Passed 4/2/25 | |
| 04/02/2025 | COT - RSME - Mechanical Final | Passed | Passed 4/2/25 | |
| 04/02/2025 | COT - RSPL - Plumbing Final | Passed | Passed 4/2/25 | |
| 04/02/2025 | RSBU - Building Final | Passed | Passed 4/2/25 | |
| 04/02/2025 | RSBU - Building Progress | Passed | Passed 4/2/25 | |
| 04/10/2025 | ENGR Engineering Final | Passed | Grade is good. Curb transition is good. Site is good. C of O ready. |