Inspection History Details
Inspection Status: Not Ready
Inspection History: ENGR Engineering Final
| Date | Description | Inspector | Results | Comments |
|---|---|---|---|---|
| 04/02/2025 | ENGR Engineering Final | Not Ready | Vertical curb transition needs to be outside of the driveway width. West grade needs to front drain, current grade is dropping to the rear by 3 inches. |
|
| 04/10/2025 | ENGR Engineering Final | Passed | Grade is good. Curb transition is good. Site is good. C of O ready. |