Microfiche records prior to 2006 have not been completely digitized and may not be available yet on PRO. If you can not find what you are looking for please submit a records request.

Permit Details

Status:
Inspections Complete
Type:
Model Building Permit
Apply Date:
04/11/2024
Applicant:
Description:
SFR RKM45X T21-M0094 REVISION-Structural change

Permit Reviews

Permit Number - TC-MDP-0823-01461
Permit Status: Inspections complete
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
Start Date Submittal Complete Date Status  
04/12/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 04/18/2024 APPROVED Review Details
08/01/2024 SITE FROM MODEL PERMIT - PRODUCTION v.1 08/07/2024 APPROVED Review Details

Outstanding Activity Conditions

Permit Number - TC-MDP-0823-01461
Permit Status: Inspections complete
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
Total Outstanding Activity Conditions - 5
Date Name
04/15/2024 SPECIAL INSPECTION FOR CONCRETE INSTALLATION IS REQUIRED.
04/15/2024 SPECIAL INSPECTION FOR EPOXY ANCHORS IS REQUIRED.
04/15/2024 SPECIAL INSPECTION FOR POST TENSION SLAB IS REQUIRED.
04/15/2024 Post-Tension Inspection Report is required.
04/15/2024 SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED.

Conditions

Permit Number - TC-MDP-0823-01461
Permit Status: Inspections complete
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
Date Description Comments
08/23/2023 Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment.
04/15/2024 Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building.

Completed Inspections

Permit Status: Inspections Complete
Permit Number: TC-MDP-0823-01461
Permit Description: SFR RKM45X T21-M0094 REVISION-Structural change
Total Completed Inspections - 22
Date Description Inspector Results Comments
05/16/2024 COT - RSPL - Backwater Valve Passed
05/16/2024 COT - RSPL - Yard Water Line Passed
05/16/2024 COT - RSPL - Sewer Passed
05/16/2024 COT - RSPL - Rough Soil Passed
05/29/2024 COT - RSEL - Grounding/Bonding Passed
05/29/2024 COT - RSEL - Electrical Underground Passed
05/29/2024 COT - RSBU - Excavation/Rebar/Zoning Passed
05/29/2024 COT - RSBU - Preslab Passed
06/28/2024 COT - RSBU - Roof Nailing Passed Roof trusses are properly secured to top plate with nails and H2.5 CLIPS. Sheathing is properly installed and nailed down per plan and code requirements. Okay to proceed with mechanical, electrical, and plumbing rough-in.
06/28/2024 COT - RSBU - Exterior/Interior Clips/Sheathing/Framing Passed 1st floor walls are properly secured to concrete floor with j-bolts, titan bolts, shot pins, and masa clips. 2nd floor walls are properly secured to wood flooring and floor joists per plan and code requirements. Plywood sheathing for exterior and interior shear walls are properly installed and nailed per plan. Okay to proceed with mechanical, electrical, and plumbing rough-in.
08/14/2024 COT - RSBU - Residential Intermediate may include Framing, Electrical, Plumbing, HVAC and/or Mechanical work. Only one inspection may be attached for all trades for final rough-in. Passed Mechanical, electrical, and plumbing rough-in is complete. Okay to proceed with installation of insulation and drywall throughout.
08/14/2024 BULD - Electrical Clearance Passed Okay to energize panel. ECO Clearance issued to TEP for this site.
08/14/2024 COT - RSPL - Gas Pressure Test Passed Gas line is under 14psi of air pressure with no leaks. Okay to proceed.
08/26/2024 COT - RSBU - Interior Shear Bracing Passed
10/21/2024 COT - BULD - SWG Clearance Passed Gas valves are installed. Okay to install meter and turn on gas.
11/06/2024 COT - RSEL - Outdoor Lighting Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
11/06/2024 COT - RSME - Mechanical Final Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
11/06/2024 RSBU - Building Final Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
11/06/2024 COT - RSPL - Plumbing Final Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
11/06/2024 RSBU - Building Progress Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
11/06/2024 COT - RSEL - Electrical Final Passed Construction is complete per plans. Okay to issue Certificate of Occupancy.
11/25/2024 ENGR Engineering Final Passed

Documents

File Name Document Type  
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_REVISION NARRATIVE_V1.PDF DOCUMENTS VIEW
2_SITEPLAN_REVISION_V1.PDF DOCUMENTS VIEW
COFT - PDSD - PERMIT CARD.PDF DOCUMENTS VIEW
1_APPLICATION_V1.PDF DOCUMENTS VIEW
1_SITEPLAN_V1.PDF DOCUMENTS VIEW
1_SPECIAL INSPECTION CERT-2024-04-11_V1.PDF DOCUMENTS VIEW