Permit: TC-MDP-0823-01428
Permit Details
Apply Date:
08/18/2023
Applicant:
Vance Goodman
Description:
2231 Sleepy Hollow Estates
Permit Reviews
Permit Number - TC-MDP-0823-01428
Permit Status: Revision fees due
Permit Description: 2231 Sleepy Hollow Estates
Start Date | Submittal | Complete Date | Status |
---|---|---|---|
08/31/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.2 | 08/31/2023 | REQUIRES RESUBMIT |
09/06/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.3 | 09/07/2023 | APPROVED |
12/05/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 12/09/2024 | REQUIRES RESUBMIT |
12/19/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.2 | 12/19/2024 | APPROVED |
08/18/2023 | SITE FROM MODEL PERMIT - PRODUCTION v.1 | 08/25/2023 | REQUIRES RESUBMIT |
01/24/2024 | BUILDING DEFERRED SUBMITTAL REVIEW v.1 | 01/24/2024 | APPROVED |
09/07/2023 | RESTAMP - RESIDENTIAL v.1 | 09/07/2023 | APPROVED |
Conditions
Permit Number - TC-MDP-0823-01428
Permit Status: Revision fees due
Permit Description: 2231 Sleepy Hollow Estates
Date | Description | Comments |
---|---|---|
05/17/2023 | Post-Installed Anchor Inspection Report is required. | |
12/19/2024 | Post-Installed Anchor Inspection Report is required. | |
05/17/2023 | Post-Tension Inspection Report is required. | |
05/17/2023 | Separate submittal to PC RWRD is required for new connections to sewer, new water meters and upsized water meters. Contact sewer@pima.gov for review and assessment. | |
08/18/2023 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
12/19/2024 | SPECIAL INSPECTION FOR SPECIAL GRADING, EXCAVATION AND FILLING IS REQUIRED. | |
05/17/2023 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. | |
12/19/2024 | Truss/Joist Design plans must be submitted and approved prior to intermediate inspections if residential building or finaling the permit if commercial building. |
Outstanding Inspections
Permit Status: Revision Fees Due
Permit Number: TC-MDP-0823-01428
Permite Description: 2231 Sleepy Hollow Estates
Total Outstanding Inspections - 7
Last Inspection Date | Description | Inspector | Results | Comments |
---|---|---|---|---|
02/07/2024 | COT - RSPL - Yard Water Line | N/A | Canceled | Canceled inspection due to wet soils. 2/7/2024 |
02/07/2024 | COT - RSPL - Sewer | N/A | Canceled | Canceled inspection due to wet soils. 2/7/2024 |
10/11/2024 | BULD - Electrical Clearance | N/A | Not Ready | . |
11/22/2024 | RSBU - Building Progress | N/A | Not Applicable | |
11/27/2024 | COT - BULD - SWG Clearance | N/A | Not Applicable | |
11/27/2024 | COT - RSPL - Gas Pressure Test | N/A | Not Applicable | |
11/25/2024 | ENGR Engineering Final | N/A | Not Ready | The landscaping is not complete. The basins are not complete. The grading in the back of the units are not complete. |
Completed Inspections
Permit Status: Revision Fees Due
Permit Number: TC-MDP-0823-01428
Permit Description: 2231 Sleepy Hollow Estates
Total Completed Inspections - 18